Back-Up Light Switch And Neutral Position Switch
WARNING: This page is about a different variant/trim than selected.
- Install the back-up light switch and neutral position switch with harness.
Tightening torque:
32.3 N.m (3.3 kgf-m, 23.8 ft-lb)
- Connect the connectors of back-up light switch and neutral position switch.
- Install the air intake chamber and cleaner case. (Non-turbo model) < Ref. to INSTALLATION , Air Cleaner Case.> < Ref. to INSTALLATION , Air Intake Chamber. >
- Install the intercooler. (Turbo model)
< Ref. to INSTALLATION , Inter-cooler. >
- Connect the battery ground cable to battery.