DTC P2532-772: Ignition Switch Run Position Circuit High: Procedure
- CHECK HARNESS AND CONNECTOR (+B SHORT)
- Disconnect the power management control ECU connector.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition A24-1 (IG2) - Body ground Power switch off 1 V or less A24-2 (IG2D) - Body ground Power switch off 1 V or less TEXT IN ILLUSTRATION*a Rear view of wire harness connector
(to Power Management Control ECU)Result
Result Proceed to NG A OK B - Reconnect the power management control ECU connector.
B → See step 3
A: Go to next step
- CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - NO. 1 INTEGRATION RELAY)
- Disconnect the power management control ECU connector.
- Remove the No. 1 integration relay from the No. 1 motor compartment relay block.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition A24-1 (IG2) - Body ground Power switch off 1 V or less A24-2 (IG2D) - Body ground Power switch off 1 V or less TEXT IN ILLUSTRATION*a Rear view of wire harness connector
(to Power Management Control ECU) - Reinstall the No. 1 integration relay.
- Reconnect the power management control ECU connector.
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK → See step 4
- POWER MANAGEMENT CONTROL ECU MUST BE REPLACED
- Even though it has been determined that the power management control ECU needs to be replaced, make sure to inspect the voltage difference between No. 1 EV battery and No. 2 EV battery before replacing it.
NEXT → See step 5
- REPLACE NO. 1 INTEGRATION RELAY. Refer to COMPONENTS
- GO TO NO. 1 EV BATTERY - NO. 2 EV BATTERY VOLTAGE DIFFERENCE INSPECTION. Refer to No. 1 EV Battery - No. 2 EV Battery Voltage Difference Inspection