Air Conditioning Panel Assembly: Installation
- CONNECT AIR MIX DAMPER CONTROL CABLE SUB-ASSEMBLY
- Engage the 2 claws and connect the air mix damper control cable.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- CONNECT NO. 2 HEATER CONTROL CABLE SUB-ASSEMBLY
- Engage the 2 claws and connect the heater control cable.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- INSTALL AIR CONDITIONING PANEL ASSEMBLY
- Connect the 3 connectors and clamp.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- Engage the 3 clips, 2 claws and install the air conditioning panel.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- INSTALL INSTRUMENT CLUSTER FINISH CENTER LOWER PANEL
(See
INSTALLATION
)
- INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transaxle)
(See
INSTALLATION
)
- INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY
(See
INSTALLATION
)
- INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY
(See
INSTALLATION
)
- INSTALL COMBINATION METER ASSEMBLY
(See
INSTALLATION
)
- INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
(See
INSTALLATION
)
- INSTALL INSTRUMENT CLUSTER FINISH LOWER PANEL
(See
INSTALLATION
)
- INSTALL INSTRUMENT CLUSTER FINISH CENTER PANEL SUB-ASSEMBLY
(See
INSTALLATION
)
- INSTALL FRONT PILLAR GARNISH RH
(See
INSTALLATION
)
- INSTALL FRONT PILLAR GARNISH LH
(See
INSTALLATION
)
- INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP RH
(See
INSTALLATION
)
- INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP LH
(See
INSTALLATION
)
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL