LEMON Manuals: Even more car manuals for everyone
Home >> Saturn >> 2006 >> Vue Red Line, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 15 (Automatic Transaxle - 4T45-E - Overhaul) >> Off-Vehicle Repair Instructions >> Transmission Holding Fixture Assemble

Transmission Holding Fixture Assemble

WARNING: This page is about a different variant/trim than selected.

Tools Required

    Fig 1: Installing Transmission Holding Fixture
    GM20158Courtesy of GENERAL MOTORS CORP.
    CAUTION: To reduce the possibility of personal injury or transmission damage, make sure, when doing the next step, that all of the bolts for the support fixture are installed as shown, and that the bolts are tightened to 11 N.m (98 lb in).
    IMPORTANT: J 41230  should be updated using J 41230-TEM  due to transmission mounting changes. See Special Tools .
  1. Install the J 41230  transmission support fixture onto the transmission. See Special Tools .
  2. Install the support fixture bolts.

    Tighten:  Tighten the support fixture bolts to 11 N.m (8 lb ft).

  3. Install the transmission and the support fixture onto the J 3289-20  fixture base. See Special Tools .
  4. Position the transmission with the side cover facing down.
  5. Insert the pin into the J 3289-20  fixture base in order to lock the unit into place. See Special Tools .