Preparing Connection Area Of The Body For Installing Rear Jacking Point
- Prepare the marked connection area for bonding and riveting.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
Connection area
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
Connection area