LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> 718 Boxster Base, Automatic DCT Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 15 (20 Fuel Supply, Actuator 2.5L -- 982 - BOXSTER/CAYMAN) >> WM, 203819 - Removing And Installing Supply Line (Engine) >> Subsequent Work

Subsequent Work

WARNING: This page is about a different variant/trim than selected.
  1. Secure engine in installation position.

    > 1001IN LOWERING THE ENGINE TO COMPLETE OTHER WORK

  2. Secure heat shield - - on cylinder bank 3 to 4.
    1. 2.1 Fit and tighten screws - -.
    2. 2.2 Heat shield on cylinder bank 3 to 4: > Tightening torque 10 Nm (7.5 ftlb.) 
    G14945673Courtesy of PORSCHE CARS NORTH AMERICA, INC.
  3. Install cover for rear underbody.

    > WM, 519419 REMOVING AND INSTALLING COVER FOR REAR UNDERBODY

  4. Fit left rear wheel.

    > 440519 REMOVING AND INSTALLING WHEEL .

  5. Install low-pressure sensor.

    200419 REMOVING AND INSTALLING LOW-PRESSURE SENSOR 

  6. Install intake-air distributor section on cylinder bank 3 and 4.

    Tighten screws on section on cylinder bank 1 and 2.

    > 244619 REMOVING AND INSTALLING INTAKE-AIR DISTRIBUTOR

  7. Move charge-air cooler into installation position.

    > 214309 SERVICE POSITION OF CHARGE-AIR COOLER

  8. Install air cleaner housing.

    > 242519 REMOVING AND INSTALLING AIR CLEANER HOUSING .

  9. Install engine compartment lid.

    > WM, 557819 REMOVING AND INSTALLING ENGINE COMPARTMENT LID

  10. Perform First start function.

    200107 BLEEDING FUEL SYSTEM ON HIGH-PRESSURE SIDE - FIRST START FUNCTION