Removing Oil Pressure Line On Cylinder Bank 4-6
WARNING: This page does not describe the selected car, but rather 9 other vehicles, including the 2013 Porsche 911, 2012 Porsche 911, 2011 Porsche 911, 2010 Porsche 911, and 2009 Porsche 911. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
Dirt and contamination
- Risk of damage to units or components
→ Protect components from dirt and contamination.
→ Clean or replace dirty components.
- Remove heat shield. Unscrew two M6 Torx screws and take off the heat shield.
- Loosen holding clamp -2-
for oil pressure line -1-
on the camshaft housing cover. Unscrew one M6 Torx screw.
- 2.1. Disconnect ignition coil plug for cylinders 4 and 5 -3- .
- 2.2. Disconnect cable plug for hall sender -4- .
- Remove ignition coil for cylinder 5. Unscrew two M6 internal Torx screws and pull off ignition coil.
- Disconnect oil pressure line -1-
on cylinder head 4-6.
- 4.1. Unscrew one M6 internal Torx screw -2-
, pull off line and close off bore immediately.
Courtesy of PORSCHE CARS NORTH AMERICA, INC.
NOTE: Mixing fluids- Risk of damage to components
→ Close off all openings immediately after exposing them (with adhesive tape, suitable stoppers).
- 4.1. Unscrew one M6 internal Torx screw -2-
, pull off line and close off bore immediately.
- Disconnect three lines on the turbocharger. Close off bores immediately after pulling off a line -1-
.
- Supply line to turbocharger oil tank
- Lower coolant line
- Upper coolant line
- Disconnect oil pressure line -2- on the turbocharger. Unscrew one M6 internal Torx screw, pull off line and close off bore.
- Remove turbocharger for cylinder bank 4-6.
- Guide out oil pressure line.
- Replace the O-rings on all lines and carefully clean the connections.
- Make sure to check the connection bores on the turbocharger for dirt and clean them if necessary.