LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2016 >> 911 Turbo, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 112 (17 - Engine - Lubrication -- CARRERA (997)) >> WM 176719 Removing And Installing Bracket For Oil Cooler (Gt3, Gt3 RS & Gt3 RS 4.0) >> Subsequent Work

Subsequent Work

WARNING: This page does not describe the selected car, but rather 9 other vehicles, including the 2013 Porsche 911, 2012 Porsche 911, 2011 Porsche 911, 2010 Porsche 911, and 2009 Porsche 911. However, it is still accessible from the selected car via links, so may be relevant.
  1. Secure the oil tank.

    → 175219 REMOVING AND INSTALLING OIL TANK .

    1. 1.1. Tighten M8 fastening screws.

      → Tightening torque: 23 Nm (17 ft. lb.) 

  2. Install and secure fuel lines.
    1. 2.1. Tighten union nuts -1-  on the fuel collection pipe and counter while doing this.

      → Tightening torque: 30 Nm (22 ft. lb.) 

      Fig 1: Identifying Fuel Lines At Fuel Collection Pipe
      G09822230Courtesy of PORSCHE CARS NORTH AMERICA, INC.
    2. 2.2. Secure clamps on fuel lines.

      → Tightening torque: 10 Nm (7.5 ft. lb.) 

  3. Install intake-air distributor.

    → 244620 REMOVING AND INSTALLING INTAKE-AIR DISTRIBUTOR .

  4. Move engine from engine assembly support to Master Gear unit elevating platform WE 1206  .
    1. 4.1. Remove engine support.
  5. Mount transmission.

    → 343527 REMOVING AND MOUNTING TRANSMISSION .

  6. Install engine.

    → 100119 REMOVING AND INSTALLING ENGINE .