Subsequent Work
WARNING: This page does not describe the selected car, but rather 9 other vehicles, including the 2013 Porsche 911, 2012 Porsche 911, 2011 Porsche 911, 2010 Porsche 911, and 2009 Porsche 911. However, it is still accessible from the selected car via links, so may be relevant.
- Secure the oil tank.
→ 175219 REMOVING AND INSTALLING OIL TANK .
- 1.1. Tighten M8 fastening screws.
→ Tightening torque: 23 Nm (17 ft. lb.)
- 1.1. Tighten M8 fastening screws.
- Install and secure fuel lines.
- 2.1. Tighten union nuts -1-
on the fuel collection pipe and counter while doing this.
→ Tightening torque: 30 Nm (22 ft. lb.)
- 2.2. Secure clamps on fuel lines.
→ Tightening torque: 10 Nm (7.5 ft. lb.)
- 2.1. Tighten union nuts -1-
on the fuel collection pipe and counter while doing this.
- Install intake-air distributor.
- Move engine from engine assembly support to Master Gear unit elevating platform WE 1206
.
- 4.1. Remove engine support.
- Mount transmission.
- Install engine.