Subsequent Work
- Install exhaust system. → INSTALLING EXHAUST SYSTEM
- Install charge-air cooler. → Installing Charge-Air Cooler
- Install rear apron. → INSTALLING REAR APRON
- Check and add engine oil. → 170101 CHECKING ENGINE-OIL LEVEL
- Check and top up coolant. → 193817 DRAINING AND FILLING COOLANT