Subsequent Work
- Install upper heat shields at the left and right. → Installing Heat Shield
- Install intake-air distributor at the left and right. → Installing Intake-Air Distributor
- Connect the battery. → 2X00IN WORK INSTRUCTIONS AFTER DISCONNECTING THE BATTERY