LEMON Manuals: Even more car manuals for everyone
Home >> Pontiac >> 2009 >> Solstice Base, 2D Convertible, Automatic >> Repair and Diagnosis >> Transmission >> Hydraulic Diagrams >> Automatic Transmission - 5L40-E - Removal & Installation, Service, Overhaul, Troubleshooting & Diagnosis >> Repair Instructions - On Vehicle >> Pressure Control Solenoid Valve Replacement >> Removal Procedure

Removal Procedure

  1. Remove the transmission fluid pan and filter. Refer to Automatic Transmission Fluid and Filter Replacement .
  2. Fig 1: Identifying PCS & Electrical Wiring Harness Connector
    GM795921Courtesy of GENERAL MOTORS CORP.
  3. Disconnect the electrical wiring harness connector (2) from the pressure control solenoid (1).
  4. Fig 2: Locating Solenoid Retainer
    GM795835Courtesy of GENERAL MOTORS CORP.
  5. Using a small screwdriver or pick, remove the pressure control solenoid retainer from the control valve body.
  6. Fig 3: Exploded View Of PCS
    GM792778Courtesy of GENERAL MOTORS CORP.
  7. Remove the pressure control solenoid (1) from the control valve body.
  8. Remove the O-ring seals (3-4) from the pressure control solenoid (1), ONLY if the O-rings are cut or worn.