Fluid Pressure Directed in Preparation for a Shift to Second Gear
- 1-2 Shift Valve:
-
D432 fluid is routed to the 1-2 shift valve (387) where it is blocked by the valve in preparation for an upshift to second gear.
D432 fluid is routed to the 1-2 shift valve (387) where it is blocked by the valve in preparation for an upshift to second gear.