LEMON Manuals: Even more car manuals for everyone
Home >> Pontiac >> 2009 >> G8 Base >> Repair and Diagnosis >> Transmission >> Hydraulic Diagrams >> Automatic Transmission - 5L40-E - Removal & Installation, Service, Overhaul, Troubleshooting & Diagnosis >> 2-3 Shift Solenoid Valve Replacement >> Installation Procedure

Installation Procedure

    Fig 1: Exploded View Of 2-3 Shift Solenoid
    GM792791Courtesy of GENERAL MOTORS CORP.
  1. Install new O-ring seals (4-5) to the 2-3 shift solenoid (7), if the O-rings were previously removed.
  2. Install the 2-3 shift solenoid (7) into the control valve body.
  3. Fig 2: Locating Solenoid Retainer
    GM795835Courtesy of GENERAL MOTORS CORP.
  4. Install the 2-3 shift solenoid retainer into the control valve body.
  5. Fig 3: View Of 2-3 Shift Solenoid & Electrical Wiring Harness Connector
    GM795839Courtesy of GENERAL MOTORS CORP.
  6. Connect the electrical connector (1) to the 2-3 shift solenoid (2).
  7. Install the transmission fluid pan. Refer to Automatic Transmission Fluid and Filter Replacement .
  8. IMPORTANT: It is recommended that transmission adaptive pressure (TAP) information be reset.
    Resetting the TAP values using a scan tool will erase all learned values in all cells. As a result, The ECM or TCM will need to relearn TAP values. Transmission performance may be affected as new TAP values are learned.
  9. Reset the TAP values. Refer to Transmission Adaptive Functions .