Installation Procedure
WARNING: This page is about a different car, the 2009 Pontiac Torrent and 2009 Chevrolet Equinox. However, it is still accessible from the selected car via links, so may be relevant.
- Install the cylinder head gasket.
- Install the cylinder head.
- Install the NEW cylinder head bolts.
Tighten the bolts in sequence to 60 N.m (44 lb ft). Turn the bolts an additional 95 degrees using the J 45059 .
- Install the engine left side exhaust manifold. Refer to Exhaust Manifold Replacement - Left Side (LNJ) .
- Install the exhaust crossover pipe. Refer to Exhaust Crossover Pipe Replacement (LNJ) .
- Install the oil level indicator tube. Refer to Oil Level Indicator Tube Replacement .
- Install the lower intake manifold. Refer to Lower Intake Manifold Replacement .
- Install the left valve rocker arm cover. Refer to Valve Rocker Arm Cover Removal - Left Side .
- Install the engine left side spark plugs. Refer to Spark Plug Replacement .
- Install the spark plug wire retainer support (1) and bolt (2) and tighten the bolt to 25 N.m (18 lb ft).
- Install the engine left side spark plug wires to the spark plugs. Refer to Spark Plug Wire Replacement .
- Fill the cooling system with engine coolant. Refer to Cooling System Draining and Filling (LNJ GE 47716 Fill) or Cooling System Draining and Filling (LNJ Static Fill) .
CAUTION:
This component uses torque-to-yield bolts. When servicing this component do not reuse the bolts, New torque-to-yield bolts must be installed. Reusing used torque-to-yield bolts will not provide proper bolt torque and clamp load. Failure to install NEW torque-to-yield bolts may lead to engine damage.
CAUTION:
Refer to Fastener Caution
.