Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install a NEW oil pressure test plug.
Tighten: Tighten the oil pressure test plug to 11 N.m (97 lb in).
- Check the transmission fluid level (fill if necessary). Refer to Transmission Fluid Checking .
- Install the front closeout panel. Refer to Floor Panel Tunnel Panel Front Closeout Panel Replacement .
- Lower the vehicle.
NOTE:
Refer to Fastener Notice
.