LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 5 (Engine Control System (DTC/Circuit Diagnosis) (5.6L) (1 Of 6)) >> DTC/Circuit Diagnosis >> DTC P0084: EVT Control Solenoid Valve >> DTC Diagnosis Procedure

DTC Diagnosis Procedure

WARNING: This page is about a different variant/trim than selected.
  1. CHECK EXHAUST VALVE TIMING CONTROL SOLENOID VALVE POWER SUPPLY CIRCUIT 
    1. Turn ignition switch OFF.
    2. Disconnect exhaust valve timing (EVT) control solenoid valve harness connector.
    3. Turn ignition switch ON.
    4. Check the voltage between EVT control solenoid valve harness connector and ground.

      DTC

      EVT control solenoid valve

      Ground

      Voltage

      Bank

      Connector

      Terminal

      P0078

      1

      F80

      2

      Ground

      Battery voltage

      P0084

      2

      F81

      2

    Is the inspection result normal?

    YES

    GO TO 3.

    NO

    GO TO 2.

  2. DETECT MALFUNCTIONING PART 

    Check the following.

    • Harness for open or short between EVT control solenoid valve and IPDM E/R
    • Loose or poor connection for each connector and harness

    Repair open circuit, short to ground or short to power in harness or connectors.

  3. CHECK EVT CONTROL SOLENOID VALVE OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT 
    1. Turn ignition switch OFF.
    2. Disconnect ECM harness connector.
    3. Check the continuity between EVT control solenoid valve harness connector and ECM harness connector.

      DTC

      EVT control solenoid valve

      ECM

      Continuity

      Bank

      Connector

      Terminal

      Connector

      Terminal

      P0078

      1

      F80

      1

      F79

      114

      Existed

      P0084

      2

      F81

      1

      115

    4. Also check harness for short to ground and short to power.

    Is the inspection result normal?

    YES

    GO TO 4.

    NO

    Repair open circuit, short to ground or short to power in harness or connectors.

  4. CHECK EVT CONTROL SOLENOID VALVE 

    Refer to Component Inspection (Echaust Valve Timing Control Solenoid Valve) .

    Is the inspection result normal?

    YES

    INSPECTION END

    NO

    Replace malfunctioning EVT control solenoid valve. Refer to Exploded View .