LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different car >> Section 503 (Engine Mechanical (4.0L)) >> Unit Disassembly And Assembly >> Engine Unit >> Dowel Pin Alignment >> Installation

Dowel Pin Alignment: Installation

WARNING: This page is about a different car, the 2019 Nissan NV3500 HD, 2019 Nissan NV2500 HD, and 2019 Nissan NV1500. However, it is still accessible from the selected car via links, so may be relevant.
  1. Installation is in the reverse order of removal.
    • When installing the drive plate to the crankshaft, use the match mark (A) as shown to correctly align the crankshaft side dowel pin to the drive plate side dowel pin hole.
      GNSDB115753Courtesy of NISSAN NORTH AMERICA, INC.
    • Install the drive plate and the reinforcement plate in the direction as shown.
      G00465468Courtesy of NISSAN NORTH AMERICA, INC.
    • Tighten the drive plate bolts in a diagonal pattern in two steps. Refer to Exploded View .