LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different car >> Section 488 (Engine Mechanical (5.6L)) >> Removal And Installation >> Cylinder Head >> Removal and Installation >> Removal

Removal and Installation: Removal

WARNING: This page is about a different car, the 2019 Nissan NV3500 HD and 2019 Nissan NV2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
  1. Remove the following parts:
  2. Disconnect water bypass hose (bank 1) and water bypass hose (bank 2) from cylinder heads.
  3. Disconnect engine coolant temperature sensor 1 harness connector on rear of cylinder head (bank 2).
  4. Disconnect knock sensors harness connectors from cylinder head (bank 1) and cylinder head (bank 2).
  5. Remove cylinder head.
    • Loosen bolts in the reverse of the sequence as shown.
      GNSJPBIA2145Z-145Courtesy of NISSAN NORTH AMERICA, INC.

      (A)

      : Bank 2

      (B)

      : Bank 1

      SYMBOL

      : Engine front

  6. Remove cylinder head gaskets.
    CAUTION: Do not reuse gaskets.
  7. Remove the following from cylinder heads (if necessary):
    • Oil filter (for VVEL ladder assembly)
    • Engine coolant temperature sensor 1
  8. Remove valve lifter (if necessary).
    • Identify installation positions, and store them without mixing them up.