LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2012 >> Cube Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 86 (Intake Manifold And Exhaust System) >> Injector Base Removal and Installation >> Installation

Injector Base Removal and Installation: Installation

WARNING: This page is about a different car, the 2013 Acura MDX, 2012 Acura MDX, 2011 Acura MDX, and 2010 Acura MDX. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the front injector base (A) and rear injector base (B) with new gaskets (C), and tighten the injector base mounting bolts/nuts (D) in a crisscross pattern in three steps, beginning with the inner nuts.
    NOTE: The front injector base gasket is different from the rear one. Do not mix injector base gasket types.
    Fig 1: Front Injector Base Gasket And Related Replacement Components With Torque Specifications
    G08052376Courtesy of AMERICAN HONDA MOTOR CO., INC.
  2. Connect the knock sensor connector (A) and install the harness holder mounting bolt (B).
    Fig 2: Lnock Sensor Connector And Harness Holder Mounting Bolt With Torque Specifications
    G08052377Courtesy of AMERICAN HONDA MOTOR CO., INC.
  3. Install the injectors (see INJECTOR REPLACEMENT ).
  4. Install the intake manifold (see INSTALLATION  ).
  5. Install power steering pump and the power steering hose bracket (see PUMP REPLACEMENT ).
  6. Install the drive belt (see DRIVE BELT REPLACEMENT ).
  7. Inspect for fuel leaks. Turn the ignition switch to ON (II) (do not operate the starter) so the fuel pump runs for about 2 seconds and pressurizes the fuel line. Repeat this operation three times, then check for fuel leakage at any point in the fuel line.