Removal and Installation: Removal
WARNING: This page is about a different car, the 2012 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.
- Release the fuel pressure. Refer to "FUEL PRESSURE CHECK ".
- Disconnect the battery negative terminal and disconnect the batter negative harness from the engine. Refer to "REMOVAL AND INSTALLATION ".
- Remove engine under cover. Refer to "REMOVAL AND INSTALLATION ".
- Drain the engine coolant. Refer to "CHANGING ENGINE COOLANT ".
- Partially drain the transmission fluid. Refer to "CHANGING THE A/T FLUID (ATF) "
- Partially drain the transfer case fluid. Refer to "REPLACEMENT ".
- Remove the engine hood. Refer to "REMOVAL AND INSTALLATION OF HOOD ASSEMBLY ".
- Remove the engine room cover, (if equipped) using power tool. Refer to "REMOVAL AND INSTALLATION ".
- Disconnect the vacuum hose between the vehicle and engine and set it aside.
- Remove the radiator assembly and hoses. Refer to "REMOVAL AND INSTALLATION ".
- Remove the drive belt. Refer to "REMOVAL AND INSTALLATION ".
- Remove the fan blade. Refer to "REMOVAL AND INSTALLATION (CRANKSHAFT DRIVEN TYPE) ".
- Remove the battery positive harness.
- Disconnect the engine room harness from the fuse box and set it aside.
- Disconnect the ECM.
- Disconnect the engine room harness from the engine side and set it aside.
- Disconnect the engine harness grounds.
- Disconnect the power steering reservoir tank from the engine and move it aside.
- Disconnect the power steering oil pump from the engine. Move it aside and secure it using suitable wire or rope. Refer to "REMOVAL AND INSTALLATION ".
- Remove the A/C compressor bolts and set the compressor aside. Refer to "REMOVAL AND INSTALLATION FOR COMPRESSOR ".
- Disconnect the brake booster vacuum line.
- Disconnect the EVAP line.
- Disconnect the fuel hose at the engine side connection. Refer to "REMOVAL AND INSTALLATION ".
- Disconnect the heater hoses at the cowl and engine.
- Remove the engine and transmission oil level indicators and indicator tubes.
- Remove the front fender protectors. Refer to "REMOVAL AND INSTALLATION OF FRONT FENDER PROTECTOR ".
- Remove the front final drive assembly. Refer to "UNIT REMOVAL AND INSTALLATION ".
- Remove the exhaust manifolds. Refer to "REMOVAL AND INSTALLATION ".
- Remove the A/T. Refer to "4WD: REMOVAL AND INSTALLATION ".
- Install the engine slingers into the left bank cylinder head (A) and right bank cylinder head (B).
Engine slinger torque: 45.0 N.m (4.6 kg-m, 33 ft-lb)
- Lift using a hoist and secure the engine in position.
- Remove engine mounting insulator bolts.
- Remove the engine assembly from the vehicle, avoid interference with the vehicle body.CAUTION: Before and during lifting, always check if any harnesses are left connected.