Home >> Mini >> 2014 >> Cooper Base, 2D Convertible, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 3036 (COLLISION - BODY PANEL REPAIR (E90) 328i, 328xi, 335i, 335xi) >> 4121 Side Frame And Door Pillars >> 4121510 Replacing Front Left Door Pillar (Front Side Panel Removed) >> Notes

4121510 Replacing Front Left Door Pillar (Front Side Panel Removed): Notes

WARNING: This page does not describe the selected car, but rather 10 other vehicles, including the 2011 BMW 328xi, 2011 BMW 328i, 2010 BMW 335xi, 2010 BMW 335i, and 2010 BMW 328xi. However, it is still accessible from the selected car via links, so may be relevant.

Read general service information under BODY .

Spot-weld bonding is used on this vehicle. Observe specific procedure  See 4100... SPOT-WELD BONDING STEEL PARTS  or 4100... OPENING ADHESIVE BONDS .

Remove or cover those vehicle components in the repair area which are susceptible to heat or dust.

Use only approved SPOT-WELDING APPARATUS  for repairs!

Place vehicle on straightening bench.

Following new body parts are required (refer to BMW Electronic Parts Catalogue):

Mark severance cuts in accordance with specified measurements and cut.

IMPORTANT: Cut outer plate only for following severance cuts.

Measurement a = approx. 130 mm from edge of rectangular hole.

Measurement b = approx. 160 mm from centerpoint of 12 mm dia. bore.

Open weld joints in areas (1).

Installation:

Weld in REINFORCING PANELS  at all severance cuts.

Apply window glass adhesive to cavity acoustic baffles  See 4100... INSTALLING A CAVITY ACOUSTIC BAFFLE (EXPANDED)  or 4100... INSTALLING A CAVITY ACOUSTIC BAFFLE (NOT EXPANDED)  (2).

Fig 3: Identifying Welding And Adhesive Applying Areas With Measurements On Left Door Pillar
G04726913Courtesy of BMW OF NORTH AMERICA, INC.

Mark severance cuts in accordance with specified measurements and cut.

IMPORTANT: Cut outer plate only for following severance cuts.

Measurement a = approx. 210 mm from roof edge.

Measurement b = approx. 80 mm below severance cut a.

Measurement c = approx. 215 mm before hole dia. 20 mm.

Open weld joints in areas (1).

Open adhesive bond in area (3).

Installation:

Sheet panel (2) is needed again to seal cowl.

Plug weld in area (3).

IMPORTANT: For following severance cut, do not damage sunroof water drain hose.

Mark severance cut (1) in accordance with measurement and cut.

Measurement a = approx. 250 mm from roof edge.

Fig 4: Identifying Roof Edge Cutting Dimension
G04726914Courtesy of BMW OF NORTH AMERICA, INC.

Open weld joint in area (1).

IMPORTANT: Do not damage sunroof water drain hose (2).
Fig 5: Identifying Sunroof Water Drain Hose And Welding Areas
G04726915Courtesy of BMW OF NORTH AMERICA, INC.

Open adhesive bond in area (1).

Open weld joint in area (2).

Fig 6: Identifying Adhesive Bond And Weld Joint Areas
G04726916Courtesy of BMW OF NORTH AMERICA, INC.