LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2010 >> Cooper S, 2D Hatchback, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 2974 (Convertible Top - Repair - E93) >> Folding Roof >> 54 37 031 Replacing butyl at seal, roof shell center left or right (with closed corners)

54 37 031 Replacing butyl at seal, roof shell center left or right (with closed corners)

WARNING: This page does not describe the selected car, but rather 11 other vehicles, including the 2013 BMW 328i, 2012 BMW 328i, 2011 BMW 328i, 2010 BMW 335i, and 2010 BMW 328i. However, it is still accessible from the selected car via links, so may be relevant.

The following repair instructions apply to roof shells with closed corners (1) only  .

For roof shells with open corners, see REPLACING BUTYL AT SEAL, ROOF SHELL CENTRE LEFT OR RIGHT (WITH OPEN CORNERS) .

Fig 1: Identifying Closed Corners
G00527766Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

New parts required:

Removing the seal: 

Move soft top into position shown in Fig 2.

Tape off seal, roof shell center, with adhesive tape.

Fig 2: Identifying Convertible Top Angle
G06181070Courtesy of BMW OF NORTH AMERICA, INC.

Move soft top into position shown in Fig 3.

Fig 3: Moving Soft Top Into Position
G00527767Courtesy of BMW OF NORTH AMERICA, INC.

Release screw (1) at rear left.

Fig 4: Identifying Screw At Rear Left
G06181137Courtesy of BMW OF NORTH AMERICA, INC.

Move soft top to assembly position .

Detach headliner (1) at side with fishbone 00 9 321.

Installation note: 

Retainers must not be damaged and must be pre-installed on headliner.

Fig 5: Detaching Headliner
G00527768Courtesy of BMW OF NORTH AMERICA, INC.

Release screws (1).

Tightening torque: 5 Nm

Fig 6: Releasing Left And Right Screws
G06181136Courtesy of BMW OF NORTH AMERICA, INC.

Heat seal to approx. 60 °C with hot air blower.

Detach outer third of seal (1) at front and rear with fishbone 00 9 321.

Fig 7: Detaching Outer Third Of Seal
G00527769Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: Protect seal from damage by masking it off.

Release screws (1).

Tightening torque: 5 Nm

Heat seal to approx. 60 °C with hot air blower.

Remove seal at left side of vehicle.

Fig 8: Identifying Roof Shell Left And Right Screws
G06181124Courtesy of BMW OF NORTH AMERICA, INC.

Preparation: 

On-the-job safety: 

Remove residual butyl from roof shell and seal.

Clean adhesive area with adhesive remover.

Air drying time: = 1 minute

IMPORTANT:

Risk of damage!

Tape off sheet metal tab (1) at front and rear with adhesive tape.

Pull seal off roof panel.

Remove butyl  from seal and roof shell.

Fig 9: Taping Off Sheet Metal Tab
G00527770Courtesy of BMW OF NORTH AMERICA, INC.

For better accessibility, affix seal (1) to front roof shell with adhesive tape.

Fig 10: Affixing Seal To Front Roof Shell With Adhesive Tape
G00527771Courtesy of BMW OF NORTH AMERICA, INC.

On-the-job safety: 

Clean adhesive area with adhesive remover.

Air drying time: = 1 minute

IMPORTANT: Adhesive area must be dry and free from dust and grease.

Prepare butyl rope dia. 4 mm, 50 mm long.

Affix butyl rope (1), starting at threaded bush. Completely close gap with butyl rope.

Fig 11: Affixing Butyl Rope
G00527772Courtesy of BMW OF NORTH AMERICA, INC.

Prepare butyl rope dia. 4 mm.

Prepare butyl rope dia. 7 mm, 200 mm long.

Affix butyl rope dia. 4 mm at area (1) along entire length of roof shell.

Affix butyl rope dia. 7 mm at area (2).

Fig 12: Affixing Butyl Rope At Areas Specified
G00527773Courtesy of BMW OF NORTH AMERICA, INC.

Prepare butyl rope dia. 4 mm, 70 mm long.

Affix butyl rope in area (1).

Fig 13: Affixing Butyl Rope
G00527774Courtesy of BMW OF NORTH AMERICA, INC.

Prepare butyl rope dia. 4 mm, 50 mm long.

Affix butyl rope (1), starting at threaded bush. Completely close gap with butyl rope.

Fig 14: Affixing Butyl Rope Starting At Threaded Bush
G00527775Courtesy of BMW OF NORTH AMERICA, INC.

Prepare butyl rope dia. 7 mm, 120 mm long.

Affix butyl rope (1) at radius.

Fig 15: Affixing Butyl Rope At Radius
G00527776Courtesy of BMW OF NORTH AMERICA, INC.

Prepare butyl rope dia. 4 mm, 70 mm long.

Affix butyl rope (1) and cut off excess butyl.

Fig 16: Affixing Butyl Rope
G00527777Courtesy of BMW OF NORTH AMERICA, INC.

Prepare butyl rope dia. 4 mm.

Affix butyl rope (1).

Fig 17: Affixing Butyl Rope
G00527778Courtesy of BMW OF NORTH AMERICA, INC.

Prepare butyl rope dia. 7 mm, 500 mm long.

Affix butyl rope in area (1) and cut off excess butyl. Make sure butyl rope (1) is correctly positioned in radius of roof shell (2).

Fig 18: Affixing Butyl Rope Correctly Positioned In Radius Of Roof Shell
G00527779Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT:

Risk of leak.

Connect and smooth all butt joins of butyl ropes.

Fig 19: Identifying Roof Shell
G00527780Courtesy of BMW OF NORTH AMERICA, INC.

Installing the seal: 

A second person will be needed to help install the seal.

IMPORTANT:

Risk of damage!

Remove adhesive tape from sheet metal tab (1) at front and rear.

Set seal in place at front and rear and adjust it sideways to correct position. Ensure that gasket is correctly seated.

Fig 20: Identifying Sheet Metal Tab
G00527781Courtesy of BMW OF NORTH AMERICA, INC.

Remove support and close roof.

Loosely install new screws.

Align seal flush at front and rear and tighten screws to secure. Check gap dimensions.

Tightening torque: 5 Nm

Fig 21: Measuring Gap Dimensions
G06181132Courtesy of BMW OF NORTH AMERICA, INC.

Tighten screw (1) at rear left.

Tightening torque: 5 Nm

Fig 22: Identifying Screws At Rear Left And Right
G06181137Courtesy of BMW OF NORTH AMERICA, INC.

Checks: