11 24 571 Replacing all conrod bearings (N62/N62TU)
Special tools required:
- 00 2 590 . See MAINTENANCE AND GENERAL INFORMATION - SPECIAL TOOLS .
- 00 9 120
- 11 2 110 . See ENGINE- SPECIAL TOOLS .
(piston removed)
The letter (1) denotes the crankshaft construction stage.
The numbers (2) denote the bearing shell classification for the relevant bearing position from 1 to 5 (main bearing cap).
Install new conrod bearing shells.
Insert one red and one blue bearing shell for each conrod.
Install piston.
Check connecting-rod bearing clearance:
Piston in BDC position.
Fit special tool 00 2 590 (Plastigage Type PG 1) to the oil-free crankshaft.
Fit bearing caps so that pair numbers match up.
Use conrod bolts to check conrod bearing clearance.
Tighten down conrod bolts with special tool 00 9 120 or special tool 11 2 110.
Tightening torque, see 11 24 1AZ in 11 24 CONNECTING RODS AND BEARINGS .
Remove bearing cap and read off bearing play at width of flattened plastic thread with assistance of measurement scale.
Conrod bearing clearance.
- Remove plastic thread.
- Lubricate crankshaft and bearing shells.
- Install new conrod bolts.
Tighten down conrod bolts with special tool 00 9 120 or special tool 11 2 110.
Tightening torque, see 11 24 1AZ in 11 24 CONNECTING RODS AND BEARINGS .