LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2010 >> Cooper S, 2D Hatchback, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 1177 (Collision - Body Panel Repair (E92 & E93)) >> Wheel Wells >> 41 14 021 Front Left Wheel Arch Replacement >> Preparation Of New Part

Preparation Of New Part

WARNING: This page does not describe the selected car, but rather 21 other vehicles, including the 2013 BMW 328xi, 2013 BMW 328i, 2012 BMW 328xi, 2012 BMW 328i, and 2011 BMW 328xi. However, it is still accessible from the selected car via links, so may be relevant.

Make severance cut on new carrier support part in accordance with severance cut on vehicle.

Open welded connections in area (1).

Fig 1: Welding Areas
G04752173Courtesy of BMW OF NORTH AMERICA, INC.

In areas (1) cut open engine support from opposite side and open welded connections.

In area (2) open welded connections from inside.

Fig 2: Engine Support Welding Areas
G06854768Courtesy of BMW OF NORTH AMERICA, INC.

Adjust new parts to fit with alignment bracket or universal mount and secure.

In areas (1) to (3), set 6.8 mm dia. holes for blind rivets N1:

Installation note: 

After adhesive has hardened, install 2 EMC screws  in areas (1) and (2).

Fig 3: EMC Screws Area
G06854769Courtesy of BMW OF NORTH AMERICA, INC.

In areas (1) and (2), set 6.8 mm dia. holes for blind rivets N1:

In areas (1) and (2), set 6.8 mm dia. holes for blind rivets N1:

Installation note: 

In area (3) 2 N5 punch rivets are used later.

Fig 5: Rivet Areas
G06854771Courtesy of BMW OF NORTH AMERICA, INC.

In areas (1) to (4), set 6.8 mm dia. holes for blind rivets N1:

Installation note: 

After adhesive has hardened install 2 EMC screws in areas (1) and (4).

Fig 6: Rivet Areas
G06854773Courtesy of BMW OF NORTH AMERICA, INC.

Set two 6.8 mm dia. holes for blind rivets N1 in area (1).

Remove all new parts and deburr holes.

Fig 7: Carrier Support Welding Areas
G04726825Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT:

Structure bonding!

Observe  preparation of bonding surfaces.