41 00... Bonding Steel On Steel
WARNING: This page does not describe the selected car, but rather 21 other vehicles, including the 2013 BMW 328xi, 2013 BMW 328i, 2012 BMW 328xi, 2012 BMW 328i, and 2011 BMW 328xi. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT:
Conform with safety precautions!
Overview of topics:
- Equipment
- Expiry date of adhesive
- Grinding and cleaning
- Gluing coat
- Hardening times
- After treatment of bonding surfaces
- Disposing of adhesive
1.0 Equipment
- Sandpaper
- Cleaning agent R1
- Adhesive K1
- Cartridge gun
2.0 Surface preparation
- For better adhesion, remove oxide film and paint from the adhesive areas with a stainless steel wire brush or special sandpaper.
- Clean bonding surfaces with cleaning agent R1.
- Allow cleaned surfaces to dry for approx. 5 minutes.
Bonding surfaces must be completely dry.
3.0 Adhesive application:
- Processing temperature of glue cartridge 18°C - 30°C.
- Object temperature, vehicle and new parts, min. 15°C.
- After applying the adhesive, check whether an adhesive component has emerged at the back of the glue cartridge. If yes, break off the bonding procedure. Clean new part. Use new glue cartridge. Contact national hotline.
- Join components and secure in position.
- Remove excess adhesive. Do not use solvent cleaning agents.
4.0 Hardening times:
- Refer to NOTES REGARDING ADHESIVE K1
5.0 Subsequent treatment of bonding surfaces
- Protect the repair area with cavity sealant.