41 11 028 Left Engine Carrier Replacement (Partial Replacement Before Front Axle)
Observe procedure for repair stage 3 .
Read contents of Body, General .
Strip down vehicle.
Place vehicle on straightening bench.
Following new body parts are required:
- (1) Partial section, engine support
- (2) Holder for diagonal strut
- (3) Repair element (not shown)
- (4) Screw (not shown)
Following consumables are required:
| Material | Quantity |
|---|---|
| Adhesive K1 | 1 |
| Blind rivets N1 | 2 |
| Blind rivets N2 | 10 |
| Cleaning agent R1 | 1 |
| Cavity sealing wax remover | 1 |
| Sealant D1 |
Removing carrier support
Mark severance cut (1) in accordance with measurement a and cut.
Measurement a=125 mm
Preparation of new part
Open welded connections in areas (1).
Take off holder.
Mark severance cut (1) in accordance with vehicle and cut.
Open welded connections on holder (1) by grinding with a belt grinder from inside.
Take off holder (1).
- The inside surfaces of the engine support must be smooth. If necessary, surface-grind existing raised areas.
- Belt grinder, see Aftersales Assistance Portal (ASAP)
Service/Technology - Workshop Equipment - Start BMW
Or at: www.bmwbroup-wep.com
Adjust new part to fit with alignment bracket or universal mount.
Drill hole (1) at side.
Take hole position from repair element.
Hole diameter 12 mm
Remove new parts.
Installing engine support
Insert screw (2) in repair element (1).
Clean all bonding surfaces with cleaning agent R1.
Apply adhesive to repair element.
Carefully slide repair element (1) into body engine support.
Make sure there is sufficient adhesive on the bonding surfaces.
Push new part onto repair element and secure with alignment bracket or universal mount.
Expand repair element with screw until it rests on engine support and adhesive can be seen to emerge.
Make sure the bonding surfaces are correctly aligned, especially on the engine end.
In area (1) install 6 blind rivets N2.
In area (1) install 2 blind rivets N2.
Adjust holder (1) with diagonal strut to fit.
In areas (2) and (3) set four 6.8 mm dia. holes.
Remove holder (1) and deburr holes.
Clean bonding surfaces (2) and (3) with cleaning agent R1.
Apply adhesive K1 to bonding surfaces.
Rivet bracket in area (2) with blind rivets N1.
In area (3) use blind rivets N2.
Remove screw after adhesive has hardened.
Seal separation point and hole with sealant.