LEMON Manuals: Even more car manuals for everyone
Home >> Mercury >> 2010 >> Milan Base, Standard >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Battery Mounting & Battery Cables >> Removal And Installation >> Battery Cables - 3.5L >> Removal and Installation

Removal and Installation

  1. With the vehicle in NEUTRAL, position it on a hoist. For additional information, refer to JACKING & LIFTING .
  2. Remove the battery tray. For additional information, refer to Removal and Installation .
  3. Remove the bolt and position the battery cable body ground terminal aside.
    • To install, tighten to 12 Nm (106 lb-in).
  4. Remove the starter solenoid terminal cover.
  5. Remove the nut and position the battery cable starter solenoid terminal aside.
    • To install, tighten to 12 Nm (106 lb-in).
  6. Remove the nut and position the starter motor solenoid wire terminal aside.
    • To install, tighten to 5 Nm (44 lb-in).
  7. Disconnect the 3 battery cable in-line harness connectors from the engine compartment wiring harness and position aside.
  8. Release the 3 battery cable locators from the engine.
  9. Remove the bolt and position the battery cable transaxle ground terminal aside.
    • To install, tighten to 10 Nm (89 lb-in).
  10. Release the battery cable locator from the transaxle stud bolt.
  11. Release the 3 battery cable locators from the LH valve cover.
  12. Position the generator protective cover aside, remove the nut and position the generator B+ terminal aside.
    • To install, tighten to 12 Nm (106 lb-in).
  13. Disconnect the generator electrical connector and position aside.
  14. Disconnect the A/C compressor clutch field electrical connector and position aside.
  15. Release the wiring harness retainer from the engine.
  16. Remove the battery cables.
  17. To install, reverse the removal procedure.