LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2025 >> S580 >> Repair and Diagnosis >> Engine Mechanical >> Exhaust >> Air Intake, Turbocharging (1 Of 2) -- 223 Chassis >> Testing & Repair >> (Remove/Install Charge Air Distributor - AR09.41-P-8683SBA)

(Remove/Install Charge Air Distributor - AR09.41-P-8683SBA)

Engine 256.8 in model 223 

G16227535Courtesy of MERCEDES-BENZ USA
G16227536Courtesy of MERCEDES-BENZ USA
G16227537Courtesy of MERCEDES-BENZ USA
WARNING Risk of injury  . Skin or eye injuries may result when handling hot or glowing objects. Wear protective gloves, protective clothing and safety glasses, if necessary. AS00.00-Z-0002-01A
WARNING Risk of injury  to skin and eyes suffering scalding from contact with hot coolantspray. Risk of poisoning  from swallowing coolant. Do not open cooling system unless coolant temperature is below 90°C. Open cap slowly and release the overpressure. Do not pour coolant into beverage containers.
Wear protective gloves, protective clothing and safety glasses.
AS20.00-Z-0001-01A
CAUTION Risk of injury  caused by scraping or cutting body parts on sharp vehicle parts Always wear protective gloves when working on or near sharp and non-deburred vehicle parts.
Deburr repair panels.
AS00.00-Z-0017-01A
Notice  Notes on coolant   AH20.00-P-2080-01KOA
Notice  Information on preventing damage to electronic components due to electrostatic discharge   AH54.00-P-0001-01A
Notice  Notes on avoiding damage through contamination and foreign objects   AH00.00-P-5000-01A
  Notes on safety-relevant components   AH00.00-Z-0019-01A
REMOVINGINSTALLING Remove/install     
1 Remove voltage of high-voltage on-board electrical system. Engine 256.8 in model 223
with code ME10 (Hybrid vehicle (plug-in, PHEV))
AR47.70-P-1000SE
2 Remove the throttle valve actuator.   AR07.51-P-1404SBA
3 Remove partial load bleed line. INSTALLATION IMPORTANT Do not install the upper engine cover until an engine test run has been performed. AR01.20-P-0019SBA
4 Remove the purge line from the purge valve to the charge-air distributor (1). INSTALLATION IMPORTANT Do not install the upper engine cover until an engine test run has been performed. AR47.30-P-0001S
5 Remove purge line (2) from charge-air distributor (1) and place to one side. SPECIAL TOOL Record plug Fig 4
6 Remove vacuum line (3) from charge-air distributor (1) and place to one side. SPECIAL TOOL Record plug Fig 4
7 Remove coolant hoses (4) from charge-air distributor (1).   AR20.20-P-7441-01RQ
    IMPORTANT Catch escaping coolant with a suitable container.
SPECIAL TOOL Set of protective covers
Fig 2
    SPECIAL TOOL Set of protective covers Fig 3
8 Release and disconnect the electrical connector (5).    
9 Unclip electrical wiring harness (6) (arrows) and place to one side. SPECIAL TOOL Dismantling tool Fig 5
10 Unscrew screw (7) and remove the bracket (8) from charge-air distributor (1). TORQUE SPECIFICATION Screw, 48 V subharness holder/cable duct to charge-air distributor *BA15.18-P-1007-03MRT 
11 Unscrew screws (9, 16). TORQUE SPECIFICATION Screw, coolant return line to charge air distributor *BA09.41-P-1013-01MRT 
12 Remove the screw (10).    
13 Remove screw (11). TORQUE SPECIFICATION Screw, charge air distributor support to crankcase *BA09.41-P-1015-01MRT 
14 Remove bolt (12). TORQUE SPECIFICATION Screw/bolt, support to charge air distributor *BA09.41-P-1018-01MRT 
15 Remove screws (13) from charge-air distributor (1) in reverse numerical sequence to tightening procedure. Tightening procedure for charge air distributor AR09.41-P-8683-01MSA
    TORQUE SPECIFICATION Screw/bolt, charge air distributor to cylinder head *BA09.41-P-1001-01MRT 
16 Remove charge-air distributor (1). INSTALLATION IMPORTANT Replace molded seals.
SPECIAL TOOL Assembly tool
Fig 1
17 Remove charge air pressure/temperature sensor (B159/2). When the charge-air distributor (1) is replaced. AR09.41-P-2012SB 
18 Remove ball socket (14). When the charge-air distributor (1) is replaced.  
19 Remove holder (15). When the charge-air distributor (1) is replaced.
TORQUE SPECIFICATION Screw/bolt, support to charge air distributor
*BA09.41-P-1018-01MRT 
CLEAN Clean     
20 Clean sealing surfaces on cylinder head and on charge-air distributor (1). Assembly cleaner *BR00.45-Z-1028-04A 
21 Install in the reverse order.    
WARNING Risk of accident  from vehicle starting off by itself when engine running. Risk of injury  (bruises and burns) resulting from working on the engine while it is being started or when it is running. Secure vehicle to prevent it from starting off by itself. Wear closed and snug-fitting work clothes. Do not touch hot or rotating parts. AS00.00-Z-0005-01A
22 Carry out engine test run and check engine for proper operation and leak tightness.    
CHARGE AIR PIPE/CHARGE AIR COOLING

Number Designation Engine 256
BA09.41-P-1001-01MRT Screw/bolt, charge air distributor to cylinder head Nm 8
CHARGE AIR PIPE/CHARGE AIR COOLING

Number Designation Engine 256
BA09.41-P-1013-01MRT Screw, coolant return line to charge air distributor Nm 8
CHARGE AIR PIPE/CHARGE AIR COOLING

Number Designation Engine 256
BA09.41-P-1015-01MRT Screw, charge air distributor support to crankcase Nm 8
CHARGE AIR PIPE/CHARGE AIR COOLING

Number Designation Engine 256
BA09.41-P-1018-01MRT Screw/bolt, support to charge air distributor Nm 20
48 V ON-BOARD ELECTRICAL SYSTEM SUBHARNESS

Number Designation Engine 256 in model 214, 223, 236
BA15.18-P-1007-03MRT Screw, 48 V subharness holder/cable duct to charge-air distributor Nm 8
Fig 1: Identifying Assembly Tool (000 589 93 63 00)
G16227538Courtesy of MERCEDES-BENZ USA
Fig 2: Identifying Set Of Protective Covers (001 589 06 91 00)
G16227539Courtesy of MERCEDES-BENZ USA
Fig 3: Identifying Set Of Protective Covers (001 589 11 91 00)
G16227540Courtesy of MERCEDES-BENZ USA
Fig 4: Identifying Record Plug (129 589 00 91 00)
G16227541Courtesy of MERCEDES-BENZ USA
Fig 5: Identifying Dismantling Tool (000 589 95 63 00)
G16227542Courtesy of MERCEDES-BENZ USA
REPAIR MATERIALS

Number Designation Order number
BR00.45-Z-1028-04A Assembly cleaner A 000 986 56 01