LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2025 >> GLB250 Base >> Repair and Diagnosis >> Body & Frame >> Towing Systems >> Frame, Trailer Operation - 247 Chassis >> Wiring Diagrams >> Trailer Recognition Control Unit Wiring Diagram >> Trailer Recognition Control Unit Wiring Diagram - PE31.19-P-2101IDA

Trailer Recognition Control Unit Wiring Diagram - PE31.19-P-2101IDA

Model 247 with code 550 (Trailer coupling) Control unit N28/1 

  Trailer recognition control unit wiring diagram   PE31.19-P-2101-97IDA 
  Abbreviations of signal and circuit designations for wiring diagrams   OV00.01-P-1001-28IDA
  Use of wiring diagrams   OV00.01-P-1901-03IDA
  Search aid for all electrical components   OV00.01-P-1909IDA
  Arrangement of electrical connectors   GF00.19-P-1005IDA
  Location of ground points   GF00.19-P-2002IDA
  Location of end sleeves   GF00.19-P-3005IDA