Update Software For Esp (R) Control Unit (Code: Vs3HOLAPLI, Acc. No.: 32 903 55) - SM42.45-D-0035SG
Model 907
with code X2R (Bodybuilder requirement: conversion to motorhome)
| Operation no. of the operation texts or standard texts and flat rates | ||||
|---|---|---|---|---|
| Category | Op. no. | Operation text | Acc. no. | Code |
| L | 02 2443 | Operations: Connect/disconnect vehicle diagnosis system | 32 903 55 | VS3HOLAPLI |
| L | 02 2445 | Operations: Connect/disconnect charger (vehicle diagnosis system connected) | 32 903 55 | VS3HOLAPLI |
| L | 02 2442 | Operations: Update .......... control unit software (vehicle diagnosis system connected) | 32 903 55 | VS3HOLAPLI |
| Notes on programming control units | AH54.21-P-0001-03Z | ||
| Check | |||
| 1 | Check whether vehicle is affected by measure. | Affected vehicles: Update software for ESP (R) control unit (code: VS3HOLAPLI, acc. no.: 32 903 55) Model 907.### ## as of 000674 up to 007927 (Bodybuilder requirement: conversion to motorhome) |
SM42.45-D-0035-01AAA |
| Update software | |||
| 2 | Connect charging equipment. | ||
| Maintaining on-board electrical system voltage when performing test and diagnosis work on vehicle | During the entire work procedure a sufficiently large voltage supply must be provided for the vehicle's on-board electrical system. Otherwise any undervoltage that occurs may damage the control units. |
AR54.10-D-1127TS | |
| 3 | Connect diagnostic system. | ||
| AD00.00-D-2000-06TS | |||
| 4 | Update software for ESP® control unit. | ||
| 5 | Disconnect diagnostic system. | ||
| AD00.00-D-2000-06TS | |||
| 6 | Remove charger from vehicle. | ||
| AR54.10-D-1127TS |