LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2021 >> Metris Van Cargo >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Electrical System, Equipment & Instruments (08 Of 11) -- 447 Chassis >> Removal & Installation >> Update Instrument Cluster Control Unit Software - SM54.30-S-0021A

Update Instrument Cluster Control Unit Software - SM54.30-S-0021A

Model 447.60#/70# ## as of 001854 up to 028165 

OPERATION NO. OF OPERATION TEXTS OR STANDARD TEXTS AND FLAT RATES

Category Op. no. Operation text Time Acc. no. Code
P 02 8890 Operations: Update instrument cluster control unit software - 54 954 51 VIVWARTINT
INSPECT Check     
1 Check whether vehicle is affected by measure IMPORTANT For authorized Mercedes-Benz service partners, only the entry in the Extended VEGA Application (EVA) edition, in the "Current" tab is decisive. An additional test of the affected vehicles in the workshop information system (WIS) or vehicle list is thereby not necessary. SM54.30-S-0021-01A
2 Check whether the vehicle is affected by the "V2RAILDRUC" measure If the vehicle is affected by the "V2RAILDRUC" measure and this measure has not yet been performed:
↓
First program the CDI control unit software.
Model 447.6##/7## ## as of 001854 up to 033083 with engine 622
If the vehicle is not affected by the "V2RAILDRUC" measure or this measure has already been performed:
↓
continue with operation step 3.
SM07.08-S-0027A
3 Print out DSB (Digital Service Booklet) service report from Input Process Output (EVA) system    
4 Call up and note down service interval indicator using key combination via instrument cluster (IC) (A1/1) IMPORTANT See owner's manual under chapter: Maintenance and care → Service interval indicator → Call up service date.  
5 Check values of service interval indicator against values from DSB (Digital Service Booklet) for plausibility IMPORTANT When the instrument cluster (IC) control unit (A1/1) is programmed, a query is issued to determine whether the values are plausible.  
  Update software     
6 Connect diagnostic unit IMPORTANT Use XENTRY Diagnostics version 03/2015 with all associated and recent add-ons (in particular add-on 4383) or a higher XENTRY Diagnostics version. The operation steps must be performed exactly as per Xentry Diagnostics.
If XENTRY Diagnostics is already connected to the vehicle:
↓
Proceed with step 7.
 
7 Connect battery charger    
REFER TO TESTING & REPAIR Maintaining on-board electrical system voltage when performing test and diagnosis work on vehicle NOTES
During the entire work procedure a sufficiently large voltage supply must be provided for the vehicle's on-board electrical system.
Otherwise any undervoltage that occurs may damage the control units.
IMPORTANT Use the charger to ensure that an adequate power supply (min. 12.5 V) is provided for the on-board electrical system battery.
AR54.10-S-1127E
8 Program software of instrument cluster (IC) control unit (A1/1)    
REFER TO TESTING & REPAIR Programming of control units IMPORTANT To do this, select the following menu items: Control unit selection → Information and communication → CI - instrument cluster (A1/1) → Adaptations → Control unit programming
IMPORTANT When the instrument cluster (IC) control unit (A1/1) is programed, various queries are output. The oil specification may need to be defined via the selection screen. The engines are filled with the following oil specifications at the factory:
Engine 622 with sheet 228.51 
Engine 651 with sheet 229.51 
IMPORTANT The operation steps must be performed exactly as per Xentry Diagnostics.
IMPORTANT On MODEL 447.6##/7## ## up to 006926, it is possible that manual commissioning of the instrument cluster (IC) control unit (A1/1) is started automatically. In this case, some data (e.g. initial registration and data regarding performed maintenance services) will need to be entered (refer to the DSB (Digital Service Booklet)). Programming proceeds automatically after the data has been entered.
IMPORTANT After programming, SCN coding of the instrument cluster (IC) control unit (A1/1) starts automatically.
AR54.21-S-0014E
9 Clear fault memory    
10 Disconnect diagnostic equipment    
11 Disconnect battery charger    
REFER TO TESTING & REPAIR Maintaining on-board electrical system voltage when performing test and diagnosis work on vehicle   AR54.10-S-1127E
12 Withdraw ignition key IMPORTANT The operation step is required for resetting the instrument cluster.  
DANGER Risk of accident  from vehicle starting off by itself when engine running. Risk of injury  (bruises and burns) resulting from working on the engine while it is being started or when it is running. Secure vehicle to prevent it from starting off by itself. Wear closed and snug-fitting work clothes. Do not touch hot or rotating parts. AS00.00-Z-0005-01A
13 Insert ignition key and start engine IMPORTANT Allow the engine to run for just a few seconds.
IMPORTANT Operation of the engine causes the instrument cluster to be reset.
 
14 Turn off engine    
15 Call up service interval indicator using key combination via instrument cluster (IC) (A1/1) and compare with entries from DSB (Digital Service Booklet) IMPORTANT See owner's manual under chapter: Maintenance and care → Service interval indicator → Call up service date.
IMPORTANT The values in the instrument cluster (IC) (A1/1) must now be identical to the values from the DSB (Digital Service Booklet).