LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2017 >> GT AMG >> Repair and Diagnosis >> Body & Frame >> Sun Roof/T-Top/Convertible Top >> Sliding Roof, Soft Top, Top Attachments -- 190 Chassis >> Testing & Repair >> Prepare Panoramic Roof Frame Body Flange For Installation. - AR77.21-P-0800-05RG

Prepare Panoramic Roof Frame Body Flange For Installation. - AR77.21-P-0800-05RG

Model 190.3 with code 416 (Panoramic sunroof) 

G16682607Courtesy of MERCEDES-BENZ USA

NOTES Do not touch bonding surface (D) in crosshatched area with bare fingers and they should be free of dust, oil, grease, wax and other adhesive components or dirt residues.

Otherwise the strength of the adhesive connection can be impaired and proper adhesion of the adhesive material is not ensured.

NOTES Only use materials from window repair kit approved and always observe processing notes included.

Otherwise the strength of the adhesive connection can be impaired and proper adhesion of the adhesive material is not ensured.

NOTES If new parts are installed during body repair in the area of the panoramic roof frame body flange, mask bonding surfaces before painting.

Otherwise the strength of the adhesive connection can be impaired and proper adhesion of the adhesive material is not ensured.

NOTES Ensure that adhesive material is applied only to present adhesive beads, which have been cut down, or to the original factory primer or repair primer approved by Daimler.

Otherwise the strength of the adhesive connection can be impaired and proper adhesion of the adhesive material is not ensured.

Prepare body flange for panoramic roof 

  1. Cut off residual adhesive material on body flange down to a height of approx. 1 mm with suitable scraper.
  2. Remove glue residues cut off from body flange.
  3. Repair paint damage on body flange.

    IMPORTANT Use only primers and paints approved by Daimler AG: https://portal.aftersales.i.daimler.com

  4. Apply primer in gluing area if glue residues are not present.

    NOTES Observe processing notes for primer. Flash-off time min. 10 minutes.

    Otherwise the adhesive force of the adhesive material starts to decrease when gluing in the panoramic roof.

    NOTES Apply primer only after primer has dried.

    Otherwise the strength of the adhesive connection can be impaired and proper adhesion of the adhesive material is not ensured.