LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2013 >> 5 Grand Touring >> Repair and Diagnosis >> External Pages >> Different car >> Section 336 (Engine Mechanical (Service Information AJ)) >> Oil Control Valve (OCV) Removal/Installation >> LH bank

LH bank

WARNING: This page is about a different car, the 2005 Mazda 6. However, it is still accessible from the selected car via links, so may be relevant.
  1. Disconnect the negative battery cable.
  2. Remove the plug hole plate.
  3. Remove the ignition coil. (See IGNITION COIL REMOVAL/INSTALLATION .)
  4. Remove the OCV connector.
  5. Remove the ventilation hose.
  6. Remove the cylinder head cover.
  7. Remove the OCV.
  8. Install the OCV.

    Tightening torque 

    8.0-12.0 N.m {82-122 kgf.cm, 71-106 in.lbf} 

  9. Install the cylinder head cover. (See CYLINDER HEAD COVER (RH) INSTALLATION NOTE .)
  10. Install the ventilation hose.
  11. Install the OCV connector.
  12. Install the ignition coil. (See IGNITION COIL REMOVAL/INSTALLATION .)
  13. Install the plug hole plate.
    Fig 1: Installing OCV
    G03643789Courtesy of MAZDA MOTORS CORP.