Secondary Control Valve Body On-Vehicle Installation
WARNING: This page is about a different car, the 2009 Mazda 6. However, it is still accessible from the selected car via links, so may be relevant.
- Install the tubular pin and new O-rings to the transaxle case.
- Install the secondary control valve body.
- Tighten the bolts and GND as shown to install the secondary control valve body.
Tightening torque 8-10 N.m {82-101 kgf.cm, 71-88 in.lbf}
BOLT LENGTH MEASURED FROM BELOW THE HEADMark Length measured from below the head B 40 mm {1.575 in} C 50 mm {1.967 in} - Connect each solenoid valve connector.
Connector color (harness-side)
SOLENOID VALVE CONNECTOR SPECIFICATIONSolenoid valve Connector color Pressure control solenoid B White Shift solenoid F Black - Apply a light coat of silicon sealant (TB1217B) to the contact surfaces of the oil cover and transaxle case.
- Install the oil cover.
Tightening torque 8-10 N.m {82-101 kgf.cm, 71-88 in.lbf}
- Add ATF. (See AUTOMATIC TRANSAXLE FLUID (ATF) REPLACEMENT [FS5A-EL] .)
- Install the aerodynamic under cover NO. 2. (See AERODYNAMIC UNDER COVER NO. 2 REMOVAL/INSTALLATION .)
- Install the PCM bracket and PCM. (See PCM REMOVAL/INSTALLATION [L5] .)
- Install the battery and battery tray. (See BATTERY REMOVAL/INSTALLATION [L5] .)
- Connect the negative battery cable.
- Perform the "Mechanical System Test". (See MECHANICAL SYSTEM TEST [FS5A-EL] .)
- Perform the "Road Test". (See ROAD TEST [FS5A-EL] .)