LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2011 >> 6 s Touring Plus >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 17 (Automatic Transaxle (Service, Removal & Installation FS5A-El)) >> Control Valve Body Removal/Installation >> Secondary Control Valve Body On-Vehicle Installation

Secondary Control Valve Body On-Vehicle Installation

WARNING: This page is about a different variant/trim than selected.
  1. Install the tubular pin and new O-rings to the transaxle case.
  2. Install the secondary control valve body.
    Fig 1: Tubular Pin And O-Rings
    G07625966Courtesy of MAZDA MOTORS CORP.
  3. Tighten the bolts and GND as shown to install the secondary control valve body.

    Tightening torque 8-10 N.m {82-101 kgf.cm, 71-88 in.lbf} 

    Bolt length measured from below the head 

    BOLT SPECIFICATION CAHRT

    Mark Length measured from below the head
    B 40 mm {1.6 in}
    C 50 mm {2.0 in}
    Fig 2: Secondary Control Valve Body GND And Bolts Tightening Sequence
    G07625967Courtesy of MAZDA MOTORS CORP.
  4. Connect each solenoid valve connector.

    Connector color (harness-side) 

    CONNECTOR COLOR REFERENCE CHART

    Solenoid valve Connector color
    Pressure control solenoid B White
    Shift solenoid F Black
    Fig 3: Pressure Control Solenoid B And Shift Solenoid F
    G07625968Courtesy of MAZDA MOTORS CORP.
  5. Apply a light coat of sealant (TB1217E)  to the contact surfaces of the oil cover and transaxle case.
    CAUTION:
    • If any sealant remains on the sealing surfaces of the transaxle case and oil pan, transaxle damage may occur. Use a cleaning fluid to remove any old sealant from the transaxle case and oil pan.
      Fig 4: Light Coat Of Sealant Applying Area On Oil Pan And Transaxle Case
      G07625969Courtesy of MAZDA MOTORS CORP.
  6. Install the oil cover before the applied sealant starts to harden.

    Tightening torque 8-10 N.m {82-101 kgf.cm, 71-88 in.lbf} 

  7. Add ATF. (See AUTOMATIC TRANSAXLE FLUID (ATF) REPLACEMENT .)
  8. Install the aerodynamic under cover NO. 2. (See AERODYNAMIC UNDER COVER NO. 2 REMOVAL/INSTALLATION .)
  9. Install the PCM bracket and PCM. (See PCM REMOVAL/INSTALLATION .)
  10. Install the battery tray. (See BATTERY REMOVAL/INSTALLATION [MZR 2.5] .)
  11. Install the battery. (See BATTERY REMOVAL/INSTALLATION [MZR 2.5] .)
  12. Connect the negative battery cable.
  13. Perform the "Mechanical System Test". (See MECHANICAL SYSTEM TEST .)
  14. Perform the "Road Test". (See ROAD TEST .)