Climate Control Pinpoint Test 6: No Operation In All Temperature Settings
CLIMATE CONTROL PINPOINT TEST 6 CHART - NO OPERATION IN ALL TEMPERATURE SETTINGS
| PINPOINT TEST 6 | NO OPERATION IN ALL TEMPERATURE SETTINGS | ||
|---|---|---|---|
| STEP | INSPECTION | ACTION | |
| 1 | CHECK THE VOLTAGE TO THE TEMPERATURE BLEND DOOR ACTUATOR MOTOR
|
Yes | Go to step 2. |
| No | Repair circuit (GY/Y). Test the system for normal operation. | ||
| 2 | CHECK THE GROUND TO THE BLEND DOOR ACTUATOR MOTOR
|
Yes | Go to step 3. |
| No | Repair circuit (B). Test the system for normal operation. | ||
| 3 | CHECK THE TEMPERATURE CONTROL POTENTIOMETER TOTAL RESISTANCE
|
Yes | Go to step 6. |
| No | If the resistance is less than 5,000 ohms, Go to step 4. If the resistance is greater than 6,000 ohms, Go to step 5. |
||
| 4 | CHECK CIRCUITS (R/W) AND (R/LG) FOR A SHORT TOGETHER
|
Yes | Repair circuits (R/W) and (R/LG) for a short together. Test the system for normal operation. |
| No | INSTALL a new temperature control potentiometer. See HEATER CONTROL UNIT REMOVAL / INSTALLATION . TEST the system for normal operation. | ||
| 5 | CHECK CIRCUITS (R/W) AND (R/LG) FOR AN OPEN
|
Yes | Install a new temperature control potentiometer. See HEATER CONTROL UNIT REMOVAL / INSTALLATION . Test the system for normal operation. |
| No | Repair the affected circuit. Test the system for normal operation. | ||
| 6 | CHECK THE TEMPERATURE CONTROL POTENTIOMETER OPERATION
|
Yes | Go to step 9. |
| No | Go to step 7. | ||
| 7 | CHECK CIRCUIT (Y/LG) FOR AN OPEN
|
Yes | Go to step 8. |
| No | Repair circuit (Y/LG) for an open. Test the system for normal operation. | ||
| 8 | CHECK CIRCUITS (Y/LG) AND (R/LG) FOR A SHORT TOGETHER
|
Yes | Repair circuits (Y/LG) and (R/LG) for a short together. Test the system for normal operation. |
| No | Install a new temperature control potentiometer. See HEATER CONTROL UNIT REMOVAL / INSTALLATION . Test the system for normal operation. | ||
| 9 | CHECK CIRCUITS (Y/LG) AND (R/LG) FOR A SHORT TO GROUND
|
Yes | Repair the affected circuit for a short to ground. Test the system for normal operation. |
| No | Go to step 10. | ||
| 10 | CHECK CIRCUITS (Y/LG) AND (R/LG) FOR A SHORT TO VOLTAGE
|
Yes | Repair the affected circuit for a short to power. Test the system for normal operation. |
| No | Go to step 11. | ||
| 11 | CHECK FOR A BINDING, STUCK OR BROKEN BLEND DOOR
|
Yes | Repair the blend door/linkage. Test the system for normal operation. |
| No | Install a new temperature blend door actuator motor. See BLEND DOOR ACTUATOR REMOVAL / INSTALLATION . Test the system for normal operation. | ||