Installation [11/2021 - ]: Procedure
- INSTALL WATER INLET WITH THERMOSTAT SUB-ASSEMBLY
- CONNECT NO. 7 WATER BY-PASS HOSE
*a View A *b 15° *c 90° (Tabs of Clip Installation Area) *d Upper Side of Vehicle *e Front Side of Vehicle *f 1 mm (0.0394 in.) or higher - Connect the No. 7 water by-pass hose to the water inlet with thermostat sub-assembly and slide the clip to secure it.NOTE:
Make sure that the tabs of the clip are within the area shown in the illustration.
- Connect the water inlet with thermostat sub-assembly connector.
- Connect the No. 7 water by-pass hose to the water inlet with thermostat sub-assembly and slide the clip to secure it.
- CONNECT NO. 2 RADIATOR HOSE
Refer to PROCEDURE - Step 35 - INSTALL INTAKE MANIFOLD
Refer to INSTALLATION [11/2021 - ]
- INSTALL GENERATOR ASSEMBLY
Refer to INSTALLATION [11/2021 - ]
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 5
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1
- INSTALL NO. 1 ENGINE UNDER COVER
Refer to PROCEDURE - Step 73
- INSTALL FRONT FENDER FRONT SPLASH SHIELD RH
- INSTALL FRONT FENDER FRONT SPLASH SHIELD LH