Installation [07/2020 - 05/2023]: Procedure
- INSTALL FRONT NO. 2 SPEAKER ASSEMBLY (for Center) NOTE:
Do not touch the cone part of the speaker.
- INSTALL NO. 1 SPEAKER OPENING COVER ASSEMBLY (for Center)
- INSTALL FRONT NO. 1 SPEAKER ASSEMBLY (for Side) NOTE:
Do not touch the cone part of the speaker.
- INSTALL NO. 1 INSTRUMENT PANEL SPEAKER PANEL SUB-ASSEMBLY (for Side)
Refer to PROCEDURE - Step 10 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 10 [10/2022 - 05/2023]
- INSTALL FRONT PILLAR GARNISH ASSEMBLY LH (for Side)
Refer to PROCEDURE - Step 8
- INSTALL FRONT DOOR NO. 2 OPENING TRIM COVER LH (for Side)
Refer to PROCEDURE - Step 31 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 31 [10/2022 - 05/2023]
- INSTALL FRONT DOOR OPENING TRIM COVER LH (for Side)
Refer to PROCEDURE - Step 33 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 33 [10/2022 - 05/2023]
- INSTALL FRONT DOOR SCUFF PLATE LH (for Side)
Refer to PROCEDURE - Step 35 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 35 [10/2022 - 05/2023]