Installation [07/2020 - 05/2023]: Procedure
- INSTALL METER MIRROR SUB-ASSEMBLY
- INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
Refer to INSTALLATION [07/2020 - 10/2022] , or refer to INSTALLATION [10/2022 - 05/2023]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to INSTALLATION [07/2020 - 05/2023]
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [07/2020 - 05/2023]
- INSTALL NO. 2 DECK BOARD
Refer to PROCEDURE - Step 13 [07/2020 - 10/2022] , or refer to PROCEDURE - Step 13 [10/2022 - 05/2023]
- CUSTOMIZE POWER TILT AND POWER TELESCOPIC STEERING COLUMN SYSTEM
- CHECK SRS WARNING LIGHT
Refer to OPERATION CHECK [07/2020 - ]
- ADJUST PARKING ASSIST MONITOR SYSTEM
Refer to CALIBRATION [07/2020 - 05/2023]