Installation [10/2018 - ]: Procedure
- INSTALL HYBRID BATTERY TERMINAL BLOCK WARNING:
Be sure to wear insulated gloves and protective goggles.
- Connect the 2 hybrid battery terminal block connectors.NOTE:
Make sure that the connectors are connected securely.
- Install the hybrid battery terminal block to the HV battery with the bolt.
*a Pin Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
NOTE:Make sure to align the hole of the hybrid battery terminal block with the pin.
- Connect the 2 hybrid battery terminal block connectors.
- INSTALL NO. 1 HV BATTERY SHIELD PANEL
Refer to PROCEDURE - Step 2
- INSTALL UPPER HV BATTERY COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 3
- CONNECT FLOOR WIRE
See step 10
- INSTALL NO. 1 HV BATTERY PROTECTOR
See step 11
- CONNECT FLOOR WIRE
See step 12
- CONNECT FLOOR UNDER WIRE
See step 13
- INSTALL NO. 1 HV BATTERY COVER PANEL RH
See step 14
- INSTALL BATTERY COOLING BLOWER ASSEMBLY
See step 1
- INSTALL REAR SEAT CUSHION LEG SUB-ASSEMBLY
See step 16
- INSTALL REAR UNDER COVER
See step 17
- INSTALL REAR UNDER SIDE COVER LH
Refer to PROCEDURE - Step 40 [10/2018 - 10/2020] Refer to PROCEDURE - Step 40 [10/2020 - 07/2022] Refer to PROCEDURE - Step 40 [07/2022 - ]
- INSTALL REAR DOOR SCUFF PLATE LH
Refer to PROCEDURE - Step 42 [10/2018 - 10/2020] Refer to PROCEDURE - Step 42 [10/2018 - 10/2020] Refer to PROCEDURE - Step 42 [07/2022 - ]
- INSTALL REAR UNDER SIDE COVER RH
HINT:
Use the same procedure as for the LH side.
Refer to PROCEDURE - Step 41 [10/2018 - 10/2020] Refer to PROCEDURE - Step 41 [10/2020 - 07/2022] Refer to PROCEDURE - Step 41 [07/2022 - ]
- INSTALL REAR DOOR SCUFF PLATE RH
HINT:
Use the same procedure as for the LH side.
Refer to PROCEDURE - Step 43 [10/2018 - 10/2020] Refer to PROCEDURE - Step 43 [10/2020 - 07/2022] Refer to PROCEDURE - Step 43 [07/2022 - ]
- INSTALL REAR SEAT CUSHION LOCK HOOK
Refer to PROCEDURE - Step 1 [10/2018 - 07/2022] Refer to PROCEDURE - Step 1 [07/2022 - ]
- INSTALL BENCH TYPE REAR SEAT CUSHION ASSEMBLY
Refer to PROCEDURE - Step 5 Refer to PROCEDURE - Step 4
- INSTALL SERVICE PLUG GRIP
Refer to INSTALLATION [10/2018 - ]
- PERFORM HIGH VOLTAGE FUSE ACCUMULATED LOAD HISTORY RESET
Refer to UTILITY [10/2018 - ]