Installation [10/2014 - ]: Procedure
- INSTALL PURGE VSV
- Attach the clamp to the purge VSV.
- Install the purge VSV to the intake manifold with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Attach the clamp and connect the No. 2 vacuum transmitting hose assembly.
- Install the No. 1 fuel vapor feed hose to the purge VSV.
- Connect the fuel vapor feed hose assembly to the purge VSV, and slide the clamp to secure the hose.
- Connect the purge VSV connector.
- Install the No. 1 check valve to the No. 1 fuel vapor feed hose.
- Attach the clamp and connect the No. 1 check valve.
- Connect the No. 2 fuel vapor feed hose to the No. 1 check valve, and slide the clamp to secure the hose.
- INSTALL NO. 2 TURBO PRESSURE SENSOR
Refer to PROCEDURE - Step 1 [10/2014 - ]
- INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 101 [10/2014 - 05/2019] , or refer to PROCEDURE - Step 102 [05/2019 - ]