LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2019 >> NX 300 Base, AWD >> Repair and Diagnosis >> Engine Mechanical >> Auxiliary Emission Control Systems >> Emission Control System - Service Information >> PCV Valve >> Installation [10/2014 - ] >> Procedure

Installation [10/2014 - ]: Procedure

  1. INSTALL PCV VALVE SUB-ASSEMBLY 
    1. Apply a light coat of engine oil to the O-ring.
    2. Using a 22 mm ball joint lock nut wrench, install the PCV valve sub-assembly to the cylinder head cover sub-assembly.

      Torque

      Specified tightening torque 

      5.0 N*m (51 kgf*cm, 44 in.*lbf)

      NOTE:

      When reusing the PCV valve sub-assembly, inspect the O-ring.

      HINT: 

      GTY519843Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Torque Wrench Fulcrum Length
      *b 22 mm Ball Joint Lock Nut Wrench
    3. Connect the No. 2 PCV hose to the PCV valve sub-assembly, and slide the clip to secure the hose.
  2. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 101 [10/2014 - 05/2019] , or refer to PROCEDURE - Step 102