Installation [09/2015 - ]: Procedure
- INSTALL COOLER DRYER
- Using pliers, install the cooler dryer.
- Apply a sufficient amount of compressor oil to the contact surfaces of a new O-ring and the cap.
Compressor oil
ND-OIL 8 or equivalent
- Install the O-ring to the cap.
- Using a 14 mm socket hexagon wrench, install the cap to the modulator.
Torque: 2.9 N*m (30 kgf*cm, 26 in.*lbf)
- INSTALL COOLER CONDENSER ASSEMBLY
- Install the cooler condenser assembly with the 4 bolts.
Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf)
- Install the cooler condenser assembly with the 4 bolts.
- CONNECT LIQUID TUBE SUB-ASSEMBLY A
- Remove the attached vinyl tape from the tube and the connecting part of the cooler condenser.
- Sufficiently apply compressor oil to a new O-ring and the fitting surface of the tube joint.
Compressor oil
ND-OIL 8 or equivalent
- Install the O-ring to the liquid tube sub-assembly A.
- Connect the liquid tube sub-assembly A to the cooler condenser with the bolt.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
NOTE:- When tightening the bolt, do not allow any tools to contact the tube.
- When tightening the bolt, hold a part of the tube near the connector.
- CONNECT DISCHARGE HOSE SUB-ASSEMBLY
- Remove the attached vinyl tape from the hose and the connecting part of the cooler condenser.
- Sufficiently apply compressor oil to a new O-ring and the fitting surface of the hose joint.
Compressor oil
ND-OIL 8 or equivalent
- Install the O-ring to the discharge hose sub-assembly.
- Connect the discharge hose sub-assembly to the cooler condenser with the bolt.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
NOTE:- When tightening the bolt, do not allow any tools to contact the hose.
- When tightening the bolt, hold a part of the hose near the connector.
- INSTALL HOOD LOCK ASSEMBLY
Refer to PROCEDURE - Step 5
- INSTALL HOOD LOCK CONTROL CABLE COVER
Refer to PROCEDURE - Step 6
- INSTALL RADIATOR UPPER SUPPORT SUB-ASSEMBLY
Refer to PROCEDURE - Step 7
- CONNECT HOOD LOCK ASSEMBLY
Refer to PROCEDURE - Step 9
- CONNECT HOOD LOCK CONTROL CABLE COVER
Refer to PROCEDURE - Step 10
- INSTALL MILLIMETER WAVE RADAR SENSOR ASSEMBLY (w/ Dynamic Radar Cruise Control System)
Refer to PROCEDURE - Step 1
- INSTALL FRONT BUMPER COVER
(Refer to INSTALLATION [09/2015 - ] )
- ADD COMPRESSOR OIL
See step 2
- CHARGE REFRIGERANT
See step 3
- WARM UP ENGINE
See step 4
- CHECK FOR LEAKAGE OF REFRIGERANT
See step 5
- ADJUST MILLIMETER WAVE RADAR SENSOR ASSEMBLY (w/ Dynamic Radar Cruise Control System)
Refer to PROCEDURE - Step 1
- INSTALL NO. 1 ENGINE UNDER COVER
Refer to PROCEDURE - Step 6
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 25
- INSTALL NO. 1 AIR CLEANER INLET
Refer to PROCEDURE - Step 3
- INSTALL V-BANK COVER SUB-ASSEMBLY