Installation [10/2017 - 11/2021]: Procedure
- INSTALL SUSPENSION TOWER DAMPER
- Install the suspension tower damper to the front upper No. 2 suspension member with the 4 bolts.
Torque: 20 N.m (204 kgf/cm, 15 ft.lbf)
NOTE:Do not extend or compress the damper.
- Install the suspension tower damper to the front upper No. 2 suspension member with the 4 bolts.
- INSTALL ENGINE UNDER COVER
for 2GR-FKS: Refer to PROCEDURE - Step 103 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 103 [09/2020 - ]
for 8AR-FTS: Refer to PROCEDURE - Step 78 [10/2016 - 09/2020] , or refer to PROCEDURE - Step 78 [09/2020 - ]