Installation [04/2013 - 08/2015]: Procedure
WARNING: This page is about a different car, the 2015 Lexus IS 250 and 2014 Lexus IS 250. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL ENGINE WATER PUMP ASSEMBLY
- Install a new water pump gasket and the engine water pump assembly with the 16 bolts.
Bolt A Bolt B Bolt C Bolt A
Torque: 21 N.m (214 kgf/cm, 15 ft.lbf)
Bolt B and C
Torque: 11 N.m (112 kgf/cm, 8 ft.lbf)
NOTE:- Make sure that there is no oil on the threads of the bolts (A).
- Be sure to replace the 2 bolts (C) with new ones or reuse them after applying adhesive.
Adhesive
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
Standard Length
Item Length Bolt A 55 mm (2.17 in.) Bolt B, C 22 mm (0.87 in.)
- Install a new water pump gasket and the engine water pump assembly with the 16 bolts.
- INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
- Install the No. 2 idler pulley sub-assembly and No. 2 idler pulley cover plate with the bolt.
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- Install the No. 2 idler pulley sub-assembly and No. 2 idler pulley cover plate with the bolt.
- INSTALL WATER INLET
- Install a new No. 1 water inlet housing gasket and water outlet pipe O-ring.
- Install the water inlet with the 4 bolts and nut.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
NOTE:Be careful not to allow the No. 1 water inlet housing gasket and water outlet pipe O-ring to get caught between the parts.
- Connect the No. 2 water by-pass hose to the water inlet and slide the clip to secure it.
- Connect the No. 3 water by-pass hose to the water inlet and slide the clip to secure it.
- Connect the No. 4 water by-pass hose to the water inlet and slide the clip to secure it.
- Connect the No. 6 water by-pass hose to the water inlet and slide the clip to secure it.
- Connect the radiator reserve tank hose to the water inlet and slide the clip to secure it.
- INSTALL WATER PUMP PULLEY
- INSTALL NO. 2 ENGINE COVER
Refer to PROCEDURE - Step 28
- INSTALL INJECTOR DRIVER
Refer to PROCEDURE - Step 1
- INSTALL NO. 1 ENGINE COVER
Refer to PROCEDURE - Step 2
- CONNECT NO. 2 RADIATOR HOSE
See step 3
- INSTALL NO. 1 RADIATOR HOSE
See step 9
- INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
Refer to PROCEDURE - Step 18
- INSTALL COMPRESSOR AND MAGNETIC CLUTCH (for 2WD)
Refer to INSTALLATION [04/2013 - 08/2015]
- INSTALL COMPRESSOR AND MAGNETIC CLUTCH (for AWD)
Refer to INSTALLATION [04/2013 - 08/2015]
- ADD ENGINE COOLANT
See step 5
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1