Inspection Procedure
WARNING: This page is about a different car, the 2008 Lexus IS F. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
When the seat belt control ECU is replaced with a new one, Initialization must be performed (See INITIALIZATION
).
- INSPECT FRONT SEAT OUTER BELT ASSEMBLY LH
- Disconnect the Q13 connector of the front seat outer belt assembly LH
- Measure the voltage according to the value (s) in the table below.
Standard Voltage
STANDARD VOLTAGE SPECIFICATIONTester Connection Switch Condition Specified Condition Q13-1 - Body ground Engine switch on (IG) Below 1 V Q13-2-Body ground Engine switch on (IG) Below 1 V
NG: REPLACE FRONT SEAT OUTER BELT ASSEMBLY LH (See REMOVAL )
OK: Go to next Step
- CHECK HARNESS AND CONNECTOR (FRONT SEAT OUTER BELT ASSEMBLY LH - SEAT BELT CONTROL ECU)
- Disconnect the cable from the negative (-) battery terminal.CAUTION: Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See INITIALIZATION ).
- Disconnect the Q38 connector of the seat belt control ECU.
- Connect the cable to the negative battery terminal
- Measure the voltage according to the value (s) in the table below.
Standard Voltage
STANDARD VOLTAGE SPECIFICATIONTester Connection Switch Condition Specified Condition Q13-1 - Body ground Engine switch on (IG) Below 1 V Q13-2 - Body ground Engine switch on (IG) Below 1 V
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE SEAT BELT CONTROL ECU (See SEAT BELT CONTROL ECU )
- Disconnect the cable from the negative (-) battery terminal.