FUEL INJECTOR (for Port Injection): Installation
WARNING: This page is about a different car, the 2006 Lexus IS 350. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL FUEL INJECTOR ASSEMBLY
- Apply gasoline to 2 new O-rings and install them to the injector.
NOTE: Check that there is no damage or foreign material in the groove of the injector when installing the injector's O-rings.
- Install the fuel injector assemblies to the fuel delivery pipe sub-assembly.NOTE:
- When the injector does not rotate smoothly, the O-ring may be pinched. Remove the injector and install a new O-ring to the injector.
- Make sure that the injector is located within the plastic stopper range as shown in the illustration.
- Apply gasoline to 2 new O-rings and install them to the injector.
- INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
- Install the 4 delivery pipe spacers to the intake manifold.
- Install the delivery pipe sub-assembly (with injector) to the intake manifold.NOTE: When the injector does not rotate smoothly, the O-ring may be pinched. Remove the injector and install a new O-ring to the injector.
- Install the fuel injector assembly to the fuel delivery pipe sub-assemblies with the 4 bolts.
Torque: 17 N*m (173 kgf*cm, 13 ft.*lbf)
- Connect the 6 injector connectors and 2 clamps.
- Push in the fuel tube connector to the delivery pipe sub-assembly and push up the retainer to engage the claws.
NOTE:
- Check for damage or foreign objects on the connected part.
- After connecting, check that the fuel tube connector and the pipe are securely connected by pulling on them.
- After connecting the fuel tube, align the paint marks on the delivery pipe.
- INSTALL INTAKE AIR SURGE TANK
- Install a new gasket to the intake air surge tank.
- Install the intake air surge tank with the 2 nuts.
Torque: 16 N*m (163 kgf*cm, 12 ft.*lbf)
- Using a 5 mm hexagon socket wrench, install the 6 bolts.
Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf)
- Install the surge tank stay to the intake air surge tank with the bolt.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Install the water hose joint to the intake air surge tank with the bolt.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the 4 wire harness clamps to the intake air surge tank.
- Connect the ventilation hose, union to check valve hose and water by-pass hose to the intake air surge tank.
- Install the No. 1 vacuum switching valve assembly to the intake air surge tank with the bolt.
Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf)
- Connect the vacuum hose to the intake air surge tank.
- INSTALL THROTTLE W/MOTOR BODY ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- CONNECT NO. 2 VENTILATION HOSE (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (See INSTALLATION )
- ADD ENGINE COOLANT (See COOLANT )
- CHECK FOR ENGINE COOLANT LEAKAGE (See ON-VEHICLE INSPECTION )
- CHECK FOR FUEL LEAKAGE (See ON-VEHICLE INSPECTION )
- INSTALL COWL TOP VENTILATOR LOUVER SUBASSEMBLY (See INSTALLATION )
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH (See INSTALLATION )
- INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH (See INSTALLATION )
- INSTALL FRONT WIPER ARM HEAD CAP (See INSTALLATION )
- INSTALL ROOF DRIP SIDE FINISH MOULDING LH
- INSTALL ROOF DRIP SIDE FINISH MOULDING RH
- INSTALL FRONT UPPER FENDER PROTECTOR LH (See INSTALLATION )
- INSTALL FRONT UPPER FENDER PROTECTOR RH
HINT:
Installation procedure of the RH side is the same as that of the LH side.
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL ENGINE ROOM SIDE COVER RH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- CHECK FUNCTION OF THROTTLE BODY (See ON-VEHICLE INSPECTION )
- PERFORM INITIALIZATION
- Perform initialization (See INITIALIZATION
).
HINT:
Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.
- Perform initialization (See INITIALIZATION
).