LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2006 >> IS 250 RWD, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 5 (Fuel (2GR-FSE)) >> FUEL INJECTOR (for Port Injection) >> Installation

FUEL INJECTOR (for Port Injection): Installation

WARNING: This page is about a different car, the 2006 Lexus IS 350. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL FUEL INJECTOR ASSEMBLY 
    1. Apply gasoline to 2 new O-rings and install them to the injector.
      Fig 1: Identifying O-Rings
      G04056407Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      NOTE: Check that there is no damage or foreign material in the groove of the injector when installing the injector's O-rings.
    2. Install the fuel injector assemblies to the fuel delivery pipe sub-assembly.
      NOTE:
      • When the injector does not rotate smoothly, the O-ring may be pinched. Remove the injector and install a new O-ring to the injector.
      • Make sure that the injector is located within the plastic stopper range as shown in the illustration.
        Fig 2: Locating Injector Within Plastic Stopper Range
        G04056408Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY 
    1. Install the 4 delivery pipe spacers to the intake manifold.
    2. Install the delivery pipe sub-assembly (with injector) to the intake manifold.
      NOTE: When the injector does not rotate smoothly, the O-ring may be pinched. Remove the injector and install a new O-ring to the injector.
      Fig 3: Identifying Delivery Pipe Sub-Assembly
      G04056409Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the fuel injector assembly to the fuel delivery pipe sub-assemblies with the 4 bolts.

      Torque: 17 N*m (173 kgf*cm, 13 ft.*lbf) 

      Fig 4: Identifying Fuel Delivery Pipe Subassembly Bolts
      G04056410Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Connect the 6 injector connectors and 2 clamps.
      Fig 5: Identifying Injector Connectors And Clamps
      G04056411Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    5. Push in the fuel tube connector to the delivery pipe sub-assembly and push up the retainer to engage the claws.
      Fig 6: Pushing Up Retainer To Engage Claws
      G04056412Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      NOTE:
      • Check for damage or foreign objects on the connected part.
      • After connecting, check that the fuel tube connector and the pipe are securely connected by pulling on them.
    6. After connecting the fuel tube, align the paint marks on the delivery pipe.
      Fig 7: Aligning Paint Marks On Delivery Pipe
      G04056413Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL INTAKE AIR SURGE TANK 
    1. Install a new gasket to the intake air surge tank.
    2. Install the intake air surge tank with the 2 nuts.

      Torque: 16 N*m (163 kgf*cm, 12 ft.*lbf) 

    3. Using a 5 mm hexagon socket wrench, install the 6 bolts.
      Fig 8: Identifying Take Air Surge Tank
      G04056414Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf) 

    4. Install the surge tank stay to the intake air surge tank with the bolt.
      Fig 9: Identifying Bolt For Surge Tank Stay
      G04056415Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

    5. Install the water hose joint to the intake air surge tank with the bolt.
      Fig 10: Identifying Water Hose Joint To Intake Air Surge Tank With Bolt
      G04056416Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

    6. Connect the 4 wire harness clamps to the intake air surge tank.
      Fig 11: Identifying Wire Harness Clamps And Intake Air Surge Tank
      G04056417Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    7. Connect the ventilation hose, union to check valve hose and water by-pass hose to the intake air surge tank.
      Fig 12: Identifying Ventilation Hose, Union, Check Valve Hose And Water By-Pass Hose
      G04056418Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    8. Install the No. 1 vacuum switching valve assembly to the intake air surge tank with the bolt.

      Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf) 

      Fig 13: Identifying No.1 Vacuum Switching Valve Assembly And Intake Air Surge Tank With Bolt
      G04056419Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    9. Connect the vacuum hose to the intake air surge tank.
  4. INSTALL THROTTLE W/MOTOR BODY ASSEMBLY (See  INSTALLATION  ) 
  5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See  INSTALLATION  ) 
  6. CONNECT NO. 2 VENTILATION HOSE (See  INSTALLATION  ) 
  7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (See  INSTALLATION  ) 
  8. ADD ENGINE COOLANT (See  COOLANT  ) 
  9. CHECK FOR ENGINE COOLANT LEAKAGE (See  ON-VEHICLE INSPECTION  ) 
  10. CHECK FOR FUEL LEAKAGE (See  ON-VEHICLE INSPECTION   ) 
  11. INSTALL COWL TOP VENTILATOR LOUVER SUBASSEMBLY (See  INSTALLATION  ) 
  12. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH (See  INSTALLATION  ) 
  13. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH (See  INSTALLATION  ) 
  14. INSTALL FRONT WIPER ARM HEAD CAP (See  INSTALLATION  ) 
  15. INSTALL ROOF DRIP SIDE FINISH MOULDING LH 
  16. INSTALL ROOF DRIP SIDE FINISH MOULDING RH 
  17. INSTALL FRONT UPPER FENDER PROTECTOR LH (See  INSTALLATION  ) 
  18. INSTALL FRONT UPPER FENDER PROTECTOR RH 

    HINT:

    Installation procedure of the RH side is the same as that of the LH side.

  19. INSTALL V-BANK COVER SUB-ASSEMBLY (See  INSTALLATION  ) 
  20. INSTALL ENGINE ROOM SIDE COVER LH (See  INSTALLATION  ) 
  21. INSTALL ENGINE ROOM SIDE COVER RH (See  INSTALLATION  ) 
  22. INSTALL COOL AIR INTAKE DUCT SEAL (See  INSTALLATION  ) 
  23. CHECK FUNCTION OF THROTTLE BODY (See  ON-VEHICLE INSPECTION  ) 
  24. PERFORM INITIALIZATION 
    1. Perform initialization (See INITIALIZATION ).

      HINT:

      Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.