LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2006 >> IS 250 RWD, Automatic >> Repair and Diagnosis >> Engine Mechanical >> Cooling System (Mechanical) >> Cooling (4GR-FSE) >> Water Pump >> Installation

Water Pump: Installation

  1. INSTALL WATER PUMP ASSEMBLY 
    1. Install a new water pump gasket and the water pump assembly with the 16 bolts.
    Fig 1: Installing Water Pump Gasket & Water Pump Assembly With Bolts
    G04044774Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) for bolts A 

    9.1 N*m (93 kgf*cm, 81 in.*lbf) for bolts B and C 

    NOTE:
    • Be sure to replace 2 bolts C with new ones or reuse them after applying adhesive 1344.
    • Make sure that there is no oil on the threads of the A bolts.
  2. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY 
    1. Install the pulley and cover plate with the bolt.

    Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

    Fig 2: Installing Pulley & Cover Plate With Bolt
    G04044775Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL WATER INLET 
    1. Install a new water inlet housing gasket No.1 and water outlet pipe O-ring.
      Fig 3: Installing Water Inlet Housing Gasket & Water Outlet Pipe O-Ring
      G04044776Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the water inlet with the 4 bolts and nut.
      Fig 4: Installing Water Inlet With Bolts & Nut
      G04044777Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

      NOTE: Be careful not to allow the O-ring to get caught between parts.
    3. Connect the 5 hoses.
      Fig 5: Connecting Hoses
      G04044778Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  4. INSTALL WATER PUMP PULLEY 
    1. Temporarily install the pulley with the 4 bolts.
    2. Using SST, hold the pulley and tighten the 4 bolts.
      Fig 6: Tightening Bolts
      G04044779Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      SST 09960-10010 (09962-01000, 09963-00700) 

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

  5. INSTALL NO. 2 ENGINE COVER (See Step 28 in  INSTALLATION  ) 
  6. INSTALL INJECTOR DRIVER (See Step 14 in  INSTALLATION  ) 
  7. INSTALL NO. 1 ENGINE COVER (See Step 27 in  INSTALLATION  ) 
  8. CONNECT RADIATOR HOSE 
    1. Connect the radiator inlet hose and radiator outlet hose to the radiator assembly and secure them with the clips.
    Fig 7: Connecting Radiator Inlet Hose & Radiator Outlet Hose To Radiator
    G04044780Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    HINT:

    • Make sure that the claws on the clips are positioned as shown in Fig 7 .
    • Dimension "a" in Fig 7 (between the hose end and the clip end) should be less than 1.0 to 5.0 mm.
    • Connect the hoses until they make contact with each stopper. (Dimension "b" should be less than 2.5 mm)
  9. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY (See Step 18 in  INSTALLATION  ) 
  10. INSTALL COMPRESSOR AND MAGNETIC CLUTCH (for 2WD) (See  INSTALLATION  ) 
  11. INSTALL COMPRESSOR AND MAGNETIC CLUTCH (for 4WD) (See  INSTALLATION  ) 
  12. INSTALL OIL FILTER BRACKET SUB-ASSEMBLY (for 4WD) (See Step 4 in  INSTALLATION  ) 
  13. INSTALL OIL FILTER BRACKET (for 4WD) (See Step 5 in  INSTALLATION  ) 
  14. CONNECT DISCHARGE HOSE SUB-ASSEMBLY (See Step 2 in  INSTALLATION  ) 
  15. CONNECT NO. 1 COOLER REFRIGERANT SUCTION HOSE (See Step 3 in  INSTALLATION  ) 
  16. INSTALL V-RIBBED BELT (See  INSTALLATION  ) 
  17. INSTALL REAR ENGINE UNDER COVER LH (for 2WD) (See  INSTALLATION  ) 
  18. INSTALL ENGINE UNDER COVER 
  19. INSTALL NO. 1 INLET AIR CLEANER (See Step 87 in  INSTALLATION  ) 
  20. CONNECT BATTERY TERMINAL (See Step 93 in  INSTALLATION  ) 
  21. ADD ENGINE OIL (See Step 5 in  REPLACEMENT  ) 
  22. ADD ENGINE COOLANT (See Step 5 in  ON-VEHICLE INSPECTION   ) 
  23. CHECK FOR ENGINE OIL LEAKS (See Step 8 in  ON-VEHICLE INSPECTION  ) 
  24. CHECK FOR ENGINE COOLANT LEAKAGE (See  ON-VEHICLE INSPECTION   ) 
  25. CHARGE REFRIGERANT (See Step 2 in  REPLACEMENT  ) 
  26. START ENGINE 
  27. CHECK FOR LEAKAGE OF REFRIGERANT (See Step 4 in  REPLACEMENT  ) 
  28. INSTALL V-BANK COVER SUB-ASSEMBLY (See Step 115 in  INSTALLATION  ) 
  29. INSTALL COOL AIR INTAKE DUCT SEAL (See Step 118 in  INSTALLATION  )