U2006-49: Network Controller - Internal electronic failure: Action
WARNING: This page is about a different variant/trim than selected.
- Prioritized Checks to Perform
- Refer to the electrical circuit diagrams and check the powertrain control module power and ground circuits for open circuit, high resistance. Repair the wiring harness as necessary
- Refer to the electrical circuit diagrams and check the FlexRay bus circuit for short circuit to ground, short circuit to power, open circuit, high resistance. Replace the wiring harness as necessary