Low Pressure Turbocharger - INGENIUM I4 2.0L Diesel - High Power (G1914799): Installation
The following step(s) applies to:
All vehicles
-
- Install the LP turbocharger.
- Install a new gasket.
Renew Part: Turbocharger to exhaust manifold gasket Quantity: 1 .
- Torque : 27 Nm
-
- Install the low pressure turbocharger oil return pipe.
- Install new O-ring seals.
Renew Part: Upper oil return pipe O-ring seal Quantity: 1 .
Renew Part: Lower oil return pipe O-ring seal(s) Quantity: 2 .
- Torque
Oil return pipe to turbocharger: 11 Nm
Oil return pipe mounting bracket: 10 Nm
-
- Install the turbocharger lower heatshield.
Torque : 9 Nm
- Install the turbocharger lower heatshield.
-
CAUTION:
- If the original exhaust manifold temperature sensor is to be installed, apply anti-seize compound meeting specification ESE-M12A4-A to the thread of the sensor.
- Make sure the anti-seize compound does not contact the tip of the sensor.
- Reposition the exhaust manifold temperature sensor into the correct location.
- Install and tighten the exhaust manifold temperature sensor.
Torque : 44 Nm
- Reposition the exhaust gas pressure sensor pipe into the correct location.
- Install and tighten the exhaust gas pressure sensor.
Torque : 35 Nm
-
- Install the turbocharger oil feed pipe.
- Install new banjo bolt washers.
Renew Part: Turbocharger oil feed pipe banjo bolt washers Quantity: 2 .
- Install and tighten the banjo bolt.
Torque : 18 Nm
-
- Install the turbocharger upper heatshield.
Torque : 9 Nm
- Install the turbocharger upper heatshield.
The following step(s) applies to:
Vehicles with diesel particulate filter (DPF)
- Install the catalytic converter and DPF
assembly.
Refer to: CATALYTIC CONVERTER AND DIESEL PARTICULATE FILTER ASSEMBLY
The following step(s) applies to:
Vehicles without diesel particulate filter (DPF)
- Install the catalytic converter assembly.
Refer to: CATALYTIC CONVERTER
The following step(s) applies to:
All vehicles
- Install the coolant hoses.
- Connect the vacuum pipes.
- Install the EGR cooler.
- Install the charge air cooler intake pipe.
Refer to: CHARGE AIR COOLER INTAKE PIPE - INGENIUM I4 2.0L DIESEL - HIGH POWER
- Connect the startup battery ground cable.
Refer to: STARTUP BATTERY DISCONNECT AND CONNECT
- If a new turbocharger is installed, the powertrain air path learn process must be done with the use of the Jaguar Land Rover (JLR) approved diagnostic equipment.
General Equipment: Jaguar Land Rover approved diagnostic equipment